IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 3679 Electronic Components, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0190 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $551 $0 Implemented
AR0190 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $235 $75 Implemented
AR0190 # 04 Y:2000 04 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $249,600 $6,949 Implemented
AR0190 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $1,150 $1,950 Not Implemented
BD0160 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $4,409 $975 Implemented
BD0160 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $3,060 $2,500 Not Implemented
BD0160 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $644 $600 Implemented
BD0160 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $466 $0 Not Implemented
BD0160 # 05 Y:2000 05 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $600 $500 Implemented
BD0160 # 06 Y:2000 06 2000 RECOVER AND REUSE WASTE MATERIAL $593 $1,500 Not Implemented
BD0160 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,334,150 $189,000 Implemented
BD0160 # 08 Y:2000 08 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $6,116 $800 Not Implemented
BD0160 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,487 $10,100 Not Implemented
GT0688 # 08 Y:2000 08 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,435 $4,950 Not Implemented
GT0688 # 07 Y:2000 07 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,920 $450 Not Implemented
GT0688 # 06 Y:2000 06 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,022 $53,400 Implemented
GT0688 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $280 $800 Implemented
GT0688 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,190 $12,285 Not Implemented
GT0688 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,360 $15,907 Not Implemented
GT0688 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,444 $2,240 Implemented
GT0688 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,760 $1,050 Not Implemented
UF0247 # 09 Y:2000 09 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $145,144 $250,000 Not Implemented
UF0247 # 08 Y:2000 08 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $20,800 $14,250 Not Implemented
UF0247 # 07 Y:2000 07 2000 METER WASTE WATER $4,196 $6,000 Not Implemented
UF0247 # 06 Y:2000 06 2000 PAY BILLS ON TIME TO AVOID LATE FEES $822 $0 Implemented