Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 3679 | Electronic Components, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0552 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $950 | $2,800 | Not Implemented |
CO0552 # 07 Y:2004 | 07 | 2004 | RECOVER AND REUSE COOLING WATER | $4,170 | $20,000 | Not Implemented |
CO0552 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $47,960 | $7,780 | Not Implemented |
CO0552 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,570 | $620 | Implemented |
CO0552 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,520 | $270 | Not Implemented |
CO0552 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $834 | $560 | Implemented |
CO0552 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,500 | $3,050 | Implemented |
CO0552 # 06 Y:2004 | 06 | 2004 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $14,250 | $71,200 | Not Implemented |
SU0195 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,140 | $555 | Implemented |
SU0195 # 04 Y:2004 | 04 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,836 | $1,837 | Implemented |
SU0195 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,236 | $1,380 | Implemented |
SU0195 # 02 Y:2004 | 02 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $333 | $0 | Not Implemented |
SU0195 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,293 | $0 | Not Implemented |
AS0390 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,783 | $400 | Implemented |
AS0390 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,263 | $30 | Implemented |
AS0390 # 01 Y:2004 | 01 | 2004 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $11,500 | $80 | Implemented |
AS0390 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,953 | $23,750 | Not Implemented |
AS0390 # 04 Y:2004 | 04 | 2004 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $3,384 | $15,950 | Not Implemented |
AS0390 # 05 Y:2004 | 05 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,779 | $197 | Implemented |
AS0390 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,590 | $230 | Not Implemented |
AS0390 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $289 | $450 | Implemented |
SD0340 # 01 Y:2004 | 01 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $8,521 | $3,790 | Not Implemented |
SD0340 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,560 | $570 | Implemented |
SD0340 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,177 | $0 | Not Implemented |
SD0340 # 04 Y:2004 | 04 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $393 | $0 | Implemented |