IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 3679 Electronic Components, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0765 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $340 $0 Implemented
OK0765 # 03 Y:2008 03 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,600 $0 Not Implemented
OK0765 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,176 $4,690 Not Implemented
OK0765 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,974 $18,623 Implemented
OK0765 # 06 Y:2008 06 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $42,105 $161,000 Implemented
OK0765 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $1,794 $2,151 Not Implemented
UD0779 # 15 Y:2008 15 2008 RECOVER WASTE HEAT FROM EQUIPMENT $481 $2,000 Not Implemented
UD0779 # 06 Y:2008 06 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $75,942 $100,000 Implemented
UD0779 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $13,503 $3,318 Implemented
UD0779 # 04 Y:2008 04 2008 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $13,555 $500 Implemented
UD0779 # 03 Y:2008 03 2008 REPLACE BOILER $17,736 $65,000 Implemented
UD0779 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $95,648 $1,000 Implemented
UD0779 # 01 Y:2008 01 2008 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $255,168 $200,000 Not Implemented
SU0267 # 13 Y:2008 13 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,863 $9,244 Implemented
SU0267 # 12 Y:2008 12 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $185 $353 Implemented
SU0267 # 11 Y:2008 11 2008 RECOVER AND REUSE SPENT ACID BATHS $1,453 $2,062 Not Implemented
SU0267 # 10 Y:2008 10 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $46,739 $23,800 Not Implemented
SU0267 # 09 Y:2008 09 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,959 $2,060 Implemented
SU0267 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $2,367 $486 Implemented
SU0267 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,466 $1,031 Implemented
SU0267 # 06 Y:2008 06 2008 DISCONNECT BALLASTS $3,272 $77 Implemented
SU0267 # 05 Y:2008 05 2008 USE SYNTHETIC LUBRICANT $187 $0 Not Implemented
SU0267 # 04 Y:2008 04 2008 DISCONNECT BALLASTS $209 $0 Not Implemented
SU0267 # 03 Y:2008 03 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $730 $0 Implemented
SU0267 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $664 $0 Implemented