Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 3679 | Electronic Components, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0765 # 02 Y:2008 | 02 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $340 | $0 | Implemented |
OK0765 # 03 Y:2008 | 03 | 2008 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,600 | $0 | Not Implemented |
OK0765 # 04 Y:2008 | 04 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,176 | $4,690 | Not Implemented |
OK0765 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,974 | $18,623 | Implemented |
OK0765 # 06 Y:2008 | 06 | 2008 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $42,105 | $161,000 | Implemented |
OK0765 # 01 Y:2008 | 01 | 2008 | INSTALL OCCUPANCY SENSORS | $1,794 | $2,151 | Not Implemented |
UD0779 # 02 Y:2008 | 02 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $95,648 | $1,000 | Implemented |
UD0779 # 15 Y:2008 | 15 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $481 | $2,000 | Not Implemented |
UD0779 # 03 Y:2008 | 03 | 2008 | REPLACE BOILER | $17,736 | $65,000 | Implemented |
UD0779 # 04 Y:2008 | 04 | 2008 | USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) | $13,555 | $500 | Implemented |
UD0779 # 05 Y:2008 | 05 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,503 | $3,318 | Implemented |
UD0779 # 06 Y:2008 | 06 | 2008 | IMPROVE COMBUSTION CONTROL CAPABILITY | $75,942 | $100,000 | Implemented |
UD0779 # 07 Y:2008 | 07 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,679 | $35,000 | Not Implemented |
UD0779 # 08 Y:2008 | 08 | 2008 | INSULATE BARE EQUIPMENT | $8,895 | $412 | Implemented |
UD0779 # 09 Y:2008 | 09 | 2008 | OPTIMIZE PLANT POWER FACTOR | $5,482 | $3,000 | Not Implemented |
UD0779 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,499 | $9,173 | Not Implemented |
UD0779 # 11 Y:2008 | 11 | 2008 | PAY BILLS ON TIME TO AVOID LATE FEES | $4,322 | $0 | Implemented |
UD0779 # 12 Y:2008 | 12 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,658 | $1,000 | Implemented |
UD0779 # 13 Y:2008 | 13 | 2008 | INSULATE BARE EQUIPMENT | $1,228 | $100 | Implemented |
UD0779 # 14 Y:2008 | 14 | 2008 | COVER OPEN TANKS | $537 | $360 | Implemented |
UD0779 # 01 Y:2008 | 01 | 2008 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $255,168 | $200,000 | Not Implemented |
SU0267 # 13 Y:2008 | 13 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,863 | $9,244 | Implemented |
SU0267 # 12 Y:2008 | 12 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $185 | $353 | Implemented |
SU0267 # 11 Y:2008 | 11 | 2008 | RECOVER AND REUSE SPENT ACID BATHS | $1,453 | $2,062 | Not Implemented |
SU0267 # 10 Y:2008 | 10 | 2008 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $46,739 | $23,800 | Not Implemented |