Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0446 # 09 Y:2003 09 2003 USE PHOTOCELL CONTROLS $140 $65 Not Implemented
AM0446 # 08 Y:2003 08 2003 CHECK FOR ACCURACY OF UTILITY / POWER METERS $300 $0 Implemented
AM0446 # 07 Y:2003 07 2003 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $730 $250 Implemented
AM0446 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $760 $650 Not Implemented
AM0446 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,060 $500 Implemented
AM0446 # 01 Y:2003 01 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,000 $40,000 Implemented
AM0446 # 02 Y:2003 02 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,310 $0 Not Implemented
AM0446 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,850 $0 Implemented
AM0446 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,060 $0 Not Implemented
AM0284 # 06 Y:1996 06 1996 USE SYNTHETIC LUBRICANT $300 $0 Not Implemented
AM0284 # 05 Y:1996 05 1996 INSULATE BARE EQUIPMENT $2,280 $1,850 Not Implemented
AM0284 # 04 Y:1996 04 1996 CONVERT TO AQUEOUS CLEANING SYSTEM $6,652 $6,168 Implemented
AM0284 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,130 $600 Implemented
AM0284 # 02 Y:1996 02 1996 PREHEAT COMBUSTION AIR WITH WASTE HEAT $13,620 $15,360 Implemented
AM0284 # 01 Y:1996 01 1996 UPGRADE OBSOLETE EQUIPMENT $899,930 $2,500,000 Implemented
AM0284 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $260 $27 Not Implemented
KG0018 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,874 $699 Not Implemented
KG0018 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $89 $15 Not Implemented
KG0018 # 02 Y:1995 02 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,356 $450 Not Implemented
KG0018 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $307 $195 Not Implemented
KG0018 # 03 Y:1995 03 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $370 $0 Not Implemented
AM0098 # 08 Y:1990 08 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $970 $137 Implemented
AM0098 # 06 Y:1990 06 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,330 $10,500 Not Implemented
AM0098 # 05 Y:1990 05 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,850 $11,750 Not Implemented
AM0098 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,980 $900 Implemented