IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

989

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0166 # 04 Y:1999 04 1999 INSTALL AN UNINTERUPTABLE POWER SUPPLY $1,395 $3,000 Not Implemented
HO0192 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,539 $8,289 Not Implemented
HO0192 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $409 $1,120 Implemented
HO0192 # 03 Y:1999 03 1999 USE RADIANT HEATER FOR SPOT HEATING $2,678 $4,800 Not Implemented
HO0192 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $2,083 $520 Implemented
HO0192 # 05 Y:1999 05 1999 INSTALL REPLACEMENT DOORS $562 $700 Implemented
HO0192 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $960 $600 Implemented
HO0192 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,000 $5,000 Not Implemented
HO0192 # 08 Y:1999 08 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,200 $1,000 Not Implemented
HO0192 # 09 Y:1999 09 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,400 $1,000 Not Implemented
HO0192 # 10 Y:1999 10 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,000 $1,000 Implemented
MS0124 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,313 $15,976 Not Implemented
MS0124 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $2,507 $944 Implemented
MS0124 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $740 $400 Implemented
MS0124 # 04 Y:1998 04 1998 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $4,500 $2,888 Implemented
MS0124 # 05 Y:1998 05 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $35,438 $25,290 Not Implemented
MS0124 # 06 Y:1998 06 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $51 $14 Implemented
CO0419 # 01 Y:1998 01 1998 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,930 $6,000 Not Implemented
CO0419 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $3,400 $1,120 Not Implemented
CO0419 # 03 Y:1998 03 1998 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $2,170 $2,820 Not Implemented
CO0419 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $350 $350 Not Implemented
CO0419 # 05 Y:1998 05 1998 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $19,614 $27,000 Not Implemented
CO0409 # 01 Y:1998 01 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $640 $600 n/a
CO0409 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $440 $628 n/a
CO0409 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $380 $400 n/a