IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

989

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0228 # 05 Y:1987 05 1987 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $9,394 $7,875 Not Implemented
OR0002 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,190 $300 Implemented
OR0002 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,568 $550 Not Implemented
OR0002 # 03 Y:1987 03 1987 MINIMIZE WATER USAGE $1,082 $300 Not Implemented
OR0002 # 04 Y:1987 04 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,563 $4,730 Not Implemented
OR0002 # 05 Y:1987 05 1987 OPTIMIZE PLANT POWER FACTOR $4,962 $7,398 Implemented
OR0002 # 06 Y:1987 06 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $543 $970 Implemented
AT0059 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $447 $612 Implemented
AT0059 # 02 Y:1986 02 1986 REDUCE SCRAP PRODUCTION $3,755 $2,000 Implemented
AT0059 # 03 Y:1986 03 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,952 $10,000 Implemented
AT0059 # 04 Y:1986 04 1986 INSULATE BARE EQUIPMENT $4,635 $500 Not Implemented
AT0059 # 05 Y:1986 05 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,743 $12,000 Not Implemented
AT0059 # 06 Y:1986 06 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $14,839 $5,000 Not Implemented
AT0059 # 07 Y:1986 07 1986 INSULATE BARE EQUIPMENT $1,232 $500 Not Implemented
AT0059 # 08 Y:1986 08 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $586 $0 Not Implemented
AT0059 # 09 Y:1986 09 1986 IMPROVE LUBRICATION PRACTICES $2,006 $0 Implemented
ST0061 # 05 Y:1986 05 1986 INSTALL AUTOMATIC STACK DAMPER $757 $1,410 Implemented
ST0061 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,593 $421 Not Implemented
ST0061 # 01 Y:1986 01 1986 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,711 $500 Implemented
ST0061 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $856 $0 Implemented
ST0061 # 03 Y:1986 03 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $11,111 $19,028 Not Implemented
KU0168 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,947 $125 Implemented
KU0168 # 02 Y:1985 02 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $842 $200 Not Implemented
KU0168 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68 $912 Not Implemented
KU0168 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $140 $0 Not Implemented