IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

989

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0148 # 08 Y:1984 08 1984 RECOVER WASTE HEAT FROM EQUIPMENT $99 $150 Not Implemented
KU0148 # 09 Y:1984 09 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $298 $12 Implemented
KU0148 # 10 Y:1984 10 1984 REDUCE VENTILATION AIR $2,954 $500 Implemented
KU0148 # 11 Y:1984 11 1984 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,658 $15,000 Not Implemented
KU0148 # 12 Y:1984 12 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,177 $17 Implemented
KU0148 # 13 Y:1984 13 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,182 $2,000 Implemented
KU0148 # 14 Y:1984 14 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $760 $0 Implemented
KU0148 # 15 Y:1984 15 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,508 $1,900 Not Implemented
KU0108 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $760 $400 Implemented
KU0108 # 02 Y:1983 02 1983 OPTIMIZE PLANT POWER FACTOR $6,604 $16,000 Implemented
KU0108 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $4,071 $300 Implemented
KU0108 # 04 Y:1983 04 1983 INSTALL TIMERS AND/OR THERMOSTATS $1,414 $400 Implemented
KU0108 # 05 Y:1983 05 1983 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $872 $132 Implemented
KU0108 # 06 Y:1983 06 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,351 $6,314 Implemented
KU0108 # 07 Y:1983 07 1983 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,840 $52 Implemented
KU0108 # 08 Y:1983 08 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $191 $0 Not Implemented
KU0108 # 09 Y:1983 09 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $329 $0 Not Implemented
KU0075 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,345 $2,826 Implemented
KU0075 # 02 Y:1983 02 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $961 $1,200 Implemented
KU0075 # 03 Y:1983 03 1983 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,626 $100 Implemented
KU0075 # 04 Y:1983 04 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $354 $74 Implemented
KU0075 # 05 Y:1983 05 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $284 $300 Implemented
KU0075 # 06 Y:1983 06 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $221 $60 Implemented
GT0148 # 01 Y:1982 01 1982 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,325 $5,549 Not Implemented
GT0148 # 02 Y:1982 02 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $195 $500 Not Implemented