IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0916 # 02 Y:2018 02 2018 AIR CONDITION ONLY SPACE NECESSARY $5,518 $200 Not Implemented
GT0916 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $12,211 $1,242 Not Implemented
GT0916 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,820 $207,295 Not Implemented
GT0916 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,406 $38,834 Implemented
GT0916 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,215 $10,400 Implemented
GT0916 # 03 Y:2018 03 2018 USE OPTIMUM TEMPERATURE $29,211 $1,600 Not Implemented
GT0916 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $55,747 $3,800 Implemented
GT0916 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $41,023 $3,991 Not Implemented
GT0916 # 01 Y:2018 01 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,228 $263 Implemented
GT0879 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,254 $2,500 Implemented
GT0879 # 06 Y:2011 06 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $339,042 $1,340,000 Not Implemented
GT0879 # 05 Y:2011 05 2011 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $4,339 $8,740 Not Implemented
GT0879 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $3,260 $4,050 Not Implemented
GT0879 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,458 $56,350 Not Implemented
GT0879 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,235 $1 Not Implemented
GT0663 # 02 Y:1999 02 1999 COMBINE UTILITY METERS $1,117 $0 Not Implemented
GT0663 # 03 Y:1999 03 1999 COMBINE UTILITY METERS $7,755 $0 Not Implemented
GT0663 # 01 Y:1999 01 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $9,639 $0 Not Implemented
GT0663 # 05 Y:1999 05 1999 COMBINE UTILITY METERS $375 $0 Not Implemented
GT0663 # 06 Y:1999 06 1999 METER WASTE WATER $980 $400 Not Implemented
GT0663 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,035 $5,000 Not Implemented
GT0663 # 08 Y:1999 08 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $3,250 $6,700 Not Implemented
GT0663 # 09 Y:1999 09 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,805 $4,600 Not Implemented
GT0663 # 10 Y:1999 10 1999 $10,000 $0 Not Implemented
GT0663 # 04 Y:1999 04 1999 MINIMIZE WATER USAGE $113 $0 Not Implemented