Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
291
matching recommendationsSIC | 3691 | Storage Batteries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0206 # 04 Y:2024 | 04 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $719 | $419 | n/a |
IP0206 # 06 Y:2024 | 06 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $1,970 | $4,748 | n/a |
IP0206 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,174 | $877 | n/a |
IP0206 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,948 | $83 | n/a |
IP0206 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,530 | $714 | n/a |
IP0206 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,184 | $17,042 | n/a |
CI0036 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $400,041 | $153,000 | n/a |
CI0036 # 06 Y:2024 | 06 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,300 | $80 | n/a |
CI0036 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $36,628 | $24,000 | n/a |
CI0036 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $54,033 | $1,200 | n/a |
CI0036 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $101,553 | $493,100 | n/a |
CI0036 # 02 Y:2024 | 02 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $209,556 | $50,000 | n/a |
CI0036 # 07 Y:2024 | 07 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,361 | $8,000 | n/a |
CI0035 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $155,337 | $1,217,286 | n/a |
CI0035 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $86,595 | $200,000 | n/a |
CI0035 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $51,626 | $1,800 | n/a |
CI0035 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,387 | $20,213 | n/a |
CI0035 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,879 | $16,500 | n/a |
CI0035 # 07 Y:2024 | 07 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $9,944 | $9,750 | n/a |
CI0035 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $4,779 | $4,500 | n/a |
CI0035 # 10 Y:2024 | 10 | 2024 | USE PHOTOCELL CONTROLS | $3,673 | $1,013 | n/a |
CI0035 # 09 Y:2024 | 09 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,345 | $2,340 | n/a |
CI0035 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $41,839 | $6,000 | n/a |
CI0011 # 02 Y:2023 | 02 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,809 | $20,000 | Not Implemented |
CI0011 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,448 | $2,393 | Not Implemented |