Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
268
matching recommendationsSIC | 3691 | Storage Batteries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0011 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,298 | $0 | n/a |
CI0011 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $11,157 | $4,800 | n/a |
CI0011 # 05 Y:2023 | 05 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,181 | $6,150 | n/a |
CI0011 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,448 | $2,393 | n/a |
CI0011 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,753 | $500 | n/a |
CI0011 # 02 Y:2023 | 02 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,809 | $20,000 | n/a |
MZ0331 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,037 | $46,350 | Implemented |
MZ0331 # 07 Y:2022 | 07 | 2022 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $76,144 | $423,000 | Not Implemented |
MZ0331 # 08 Y:2022 | 08 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $110,196 | $55,220 | Not Implemented |
MZ0331 # 06 Y:2022 | 06 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $31,613 | $98,280 | Implemented |
MZ0331 # 04 Y:2022 | 04 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,985 | $29,286 | Implemented |
MZ0331 # 03 Y:2022 | 03 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $91,773 | $9,040 | Implemented |
MZ0331 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,162 | $25,757 | Implemented |
MZ0331 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $402,938 | $1,820,000 | Not Implemented |
UL2212 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,936 | $19,500 | Not Implemented |
UL2212 # 05 Y:2022 | 05 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,902 | $63,000 | Not Implemented |
UL2212 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,406 | $237,031 | Not Implemented |
UL2212 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,840 | $16,294 | Not Implemented |
UL2212 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $1,208 | $2,171 | Not Implemented |
UF0575 # 02 Y:2022 | 02 | 2022 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $175,432 | $0 | Not Implemented |
UF0575 # 07 Y:2022 | 07 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $200,000 | $0 | Implemented |
UF0575 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,831 | $290 | Implemented |
UF0575 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $320,724 | $1,068,750 | Implemented |
UF0575 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $59,112 | $64,054 | Implemented |
UF0575 # 04 Y:2022 | 04 | 2022 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $5,193 | $12,000 | Not Implemented |