Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 3691 | Storage Batteries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0571 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,230 | $1,000 | Implemented |
CO0571 # 09 Y:2005 | 09 | 2005 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $1,540 | $14,140 | Not Implemented |
CO0571 # 08 Y:2005 | 08 | 2005 | INSTALL SKYLIGHTS | $6,230 | $56,000 | Not Implemented |
CO0571 # 07 Y:2005 | 07 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $9,920 | $6,000 | Not Implemented |
CO0571 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,660 | $37,360 | Not Implemented |
CO0571 # 05 Y:2005 | 05 | 2005 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $770 | $3,000 | Not Implemented |
CO0571 # 04 Y:2005 | 04 | 2005 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,540 | $3,240 | Not Implemented |
CO0571 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,520 | $5,600 | Not Implemented |
CO0571 # 02 Y:2005 | 02 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,130 | $1,560 | Not Implemented |
CO0571 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,580 | $500 | Implemented |
CO0419 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $350 | $350 | Not Implemented |
CO0419 # 05 Y:1998 | 05 | 1998 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $19,614 | $27,000 | Not Implemented |
CO0419 # 03 Y:1998 | 03 | 1998 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $2,170 | $2,820 | Not Implemented |
CO0419 # 02 Y:1998 | 02 | 1998 | INSULATE BARE EQUIPMENT | $3,400 | $1,120 | Not Implemented |
CO0419 # 01 Y:1998 | 01 | 1998 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,930 | $6,000 | Not Implemented |
CO0251 # 01 Y:1992 | 01 | 1992 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,080 | $250 | Implemented |
CO0251 # 09 Y:1992 | 09 | 1992 | OPTIMIZE PLANT POWER FACTOR | $1,320 | $2,580 | Implemented |
CO0251 # 08 Y:1992 | 08 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $190 | $690 | Implemented |
CO0251 # 07 Y:1992 | 07 | 1992 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,770 | $2,270 | Implemented |
CO0251 # 06 Y:1992 | 06 | 1992 | UPGRADE CONTROLS ON COMPRESSORS | $600 | $150 | Implemented |
CO0251 # 05 Y:1992 | 05 | 1992 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $1,580 | $1,100 | Implemented |
CO0251 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,910 | $780 | Implemented |
CO0251 # 03 Y:1992 | 03 | 1992 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,380 | $1,050 | Implemented |
CO0251 # 02 Y:1992 | 02 | 1992 | INSULATE BARE EQUIPMENT | $7,370 | $830 | Implemented |