IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3691 Storage Batteries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0446 # 02 Y:2003 02 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,310 $0 Not Implemented
AM0446 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,850 $0 Implemented
AM0446 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,060 $0 Not Implemented
AM0446 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,060 $500 Implemented
AM0446 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $760 $650 Not Implemented
AM0446 # 07 Y:2003 07 2003 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $730 $250 Implemented
AM0446 # 08 Y:2003 08 2003 CHECK FOR ACCURACY OF UTILITY / POWER METERS $300 $0 Implemented
AM0446 # 09 Y:2003 09 2003 USE PHOTOCELL CONTROLS $140 $65 Not Implemented
AM0446 # 01 Y:2003 01 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,000 $40,000 Implemented
AS0343 # 12 Y:2003 12 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $319,824 $3,600 Not Implemented
AS0343 # 11 Y:2003 11 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $68,455 $3,840 Not Implemented
AS0343 # 10 Y:2003 10 2003 AUTOMATE FINISHING PROCESS $10,575 $22,000 Implemented
AS0343 # 09 Y:2003 09 2003 MODIFY WORKLOAD $41,600 $250 Implemented
AS0343 # 08 Y:2003 08 2003 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $6,600 $60 Implemented
AS0343 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $48 $134 Not Implemented
AS0343 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,552 $6,867 Implemented
AS0343 # 05 Y:2003 05 2003 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $12,973 $30,140 Not Implemented
AS0343 # 04 Y:2003 04 2003 RECOVER MECHANICAL ENERGY $1,455 $250 Not Implemented
AS0343 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,795 $30 Implemented
AS0343 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $228 $30 Not Implemented
AS0343 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,371 $20,633 Implemented