IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
SIC 3694 Engine Electrical Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0410 # 02 Y:1993 02 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,103 $8,550 Not Implemented
KU0410 # 10 Y:1993 10 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $239 $400 Not Implemented
KU0410 # 09 Y:1993 09 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $250 $260 Not Implemented
KU0410 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $324 $201 Not Implemented
KU0410 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $380 $748 Not Implemented
KU0410 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $471 $1,650 Not Implemented
KU0410 # 05 Y:1993 05 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $810 $57 Not Implemented
KU0410 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $1,730 $3,154 Not Implemented
KU0410 # 03 Y:1993 03 1993 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,797 $7,300 Not Implemented
KU0410 # 01 Y:1993 01 1993 UPGRADE OBSOLETE EQUIPMENT $11,139 $4,300 Not Implemented
WI0186 # 01 Y:1993 01 1993 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $14,209 $15,000 n/a
WI0186 # 02 Y:1993 02 1993 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,375 $0 n/a
WI0186 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,035 $10,375 n/a
WI0186 # 04 Y:1993 04 1993 USE PHOTOCELL CONTROLS $1,100 $525 n/a
WI0186 # 05 Y:1993 05 1993 INSTALL OCCUPANCY SENSORS $211 $372 n/a
WI0186 # 06 Y:1993 06 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $567 $700 n/a
WI0186 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $353 $1,280 n/a
WI0186 # 08 Y:1993 08 1993 RECOVER WASTE HEAT FROM EQUIPMENT $303 $1,200 n/a
WI0186 # 09 Y:1993 09 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $322 $200 n/a