Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 3694 | Engine Electrical Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0225 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,037 | $53,169 | Not Implemented |
TT0225 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,576 | $3,500 | Not Implemented |
TT0225 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,140 | $3,390 | Not Implemented |
TT0225 # 05 Y:2019 | 05 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,118 | $1,900 | Not Implemented |
TT0225 # 01 Y:2019 | 01 | 2019 | APPLY FOR INVESTMENT INCENTIVES | $61,196 | $11,500 | Implemented |
UK1904 # 14 Y:2019 | 14 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $40,920 | $180,000 | n/a |
UK1904 # 13 Y:2019 | 13 | 2019 | INSULATE BARE EQUIPMENT | $481 | $419 | n/a |
UK1904 # 12 Y:2019 | 12 | 2019 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $986 | $3,960 | n/a |
UK1904 # 11 Y:2019 | 11 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $828 | $1,150 | n/a |
UK1904 # 10 Y:2019 | 10 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,940 | $4,150 | n/a |
UK1904 # 09 Y:2019 | 09 | 2019 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $854 | $660 | n/a |
UK1904 # 08 Y:2019 | 08 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $64,369 | $260,000 | n/a |
UK1904 # 07 Y:2019 | 07 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,714 | $720 | n/a |
UK1904 # 06 Y:2019 | 06 | 2019 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $364 | $1,800 | n/a |
UK1904 # 05 Y:2019 | 05 | 2019 | INSTALL SKYLIGHTS | $18,882 | $84,800 | n/a |
UK1904 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $53,325 | $243,934 | n/a |
UK1904 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,795 | $14,400 | n/a |
UK1904 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,073 | $0 | n/a |
UK1904 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,228 | $3,681 | n/a |
UD0999 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $19,669 | $11,170 | Not Implemented |
UD0999 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $4,677 | $353 | Not Implemented |
UD0999 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $6,465 | $596 | Not Implemented |
UD0999 # 02 Y:2019 | 02 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,453 | $0 | Implemented |
UD0999 # 01 Y:2019 | 01 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,762 | $0 | Not Implemented |