Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
28
matching recommendationsSIC | 3699 | Electrical Equipment & Supplies, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0152 # 13 Y:1985 | 13 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $209 | $0 | Implemented |
KU0152 # 12 Y:1985 | 12 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $189 | $20 | Implemented |
KU0152 # 11 Y:1985 | 11 | 1985 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $233 | $14 | Implemented |
KU0152 # 10 Y:1985 | 10 | 1985 | INSULATE BARE EQUIPMENT | $129 | $113 | Not Implemented |
KU0152 # 09 Y:1985 | 09 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $155 | $280 | Implemented |
KU0152 # 08 Y:1985 | 08 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $176 | $600 | Implemented |
KU0152 # 07 Y:1985 | 07 | 1985 | REDUCE VENTILATION AIR | $877 | $100 | Implemented |
KU0152 # 06 Y:1985 | 06 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,085 | $2,160 | Not Implemented |
KU0152 # 05 Y:1985 | 05 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $859 | $0 | Implemented |
KU0152 # 04 Y:1985 | 04 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $2,676 | $149 | Implemented |
KU0152 # 03 Y:1985 | 03 | 1985 | USE OPTIMUM TEMPERATURE | $2,973 | $2,000 | Implemented |
KU0152 # 02 Y:1985 | 02 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,286 | $1,500 | Not Implemented |
KU0152 # 01 Y:1985 | 01 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,790 | $1,100 | Implemented |
KU0148 # 15 Y:1984 | 15 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,508 | $1,900 | Not Implemented |
KU0148 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,910 | $36 | Implemented |
KU0148 # 14 Y:1984 | 14 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $760 | $0 | Implemented |
KU0148 # 13 Y:1984 | 13 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,182 | $2,000 | Implemented |
KU0148 # 12 Y:1984 | 12 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,177 | $17 | Implemented |
KU0148 # 11 Y:1984 | 11 | 1984 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,658 | $15,000 | Not Implemented |
KU0148 # 10 Y:1984 | 10 | 1984 | REDUCE VENTILATION AIR | $2,954 | $500 | Implemented |
KU0148 # 09 Y:1984 | 09 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $298 | $12 | Implemented |
KU0148 # 08 Y:1984 | 08 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $99 | $150 | Not Implemented |
KU0148 # 07 Y:1984 | 07 | 1984 | INSULATE BARE EQUIPMENT | $1,738 | $1,240 | Not Implemented |
KU0148 # 06 Y:1984 | 06 | 1984 | INSULATE BARE EQUIPMENT | $173 | $70 | Not Implemented |
KU0148 # 05 Y:1984 | 05 | 1984 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $366 | $100 | Implemented |