Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsSIC | 3699 | Electrical Equipment & Supplies, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0188 # 08 Y:1996 | 08 | 1996 | USE OPTIMUM TEMPERATURE | $570 | $530 | Not Implemented |
ME0188 # 07 Y:1996 | 07 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $646 | $1,118 | Implemented |
ME0188 # 06 Y:1996 | 06 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,521 | $2,761 | Implemented |
ME0188 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,440 | $18,689 | Implemented |
ME0188 # 04 Y:1996 | 04 | 1996 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $13,452 | $308 | Implemented |
ME0188 # 03 Y:1996 | 03 | 1996 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $26,743 | $600 | Implemented |
ME0188 # 02 Y:1996 | 02 | 1996 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $40,938 | $4,108 | Not Implemented |
ME0188 # 01 Y:1996 | 01 | 1996 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $58,152 | $127,000 | Not Implemented |
ME0154 # 10 Y:1995 | 10 | 1995 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $300 | $150 | Not Implemented |
ME0154 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,883 | $50,267 | Not Implemented |
ME0154 # 09 Y:1995 | 09 | 1995 | MINIMIZE WATER USAGE | $2,815 | $440 | Implemented |
ME0154 # 08 Y:1995 | 08 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,900 | $400 | Implemented |
ME0154 # 07 Y:1995 | 07 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,118 | $800 | Not Implemented |
ME0154 # 06 Y:1995 | 06 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,537 | $1,175 | Implemented |
ME0154 # 05 Y:1995 | 05 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,796 | $980 | Not Implemented |
ME0154 # 04 Y:1995 | 04 | 1995 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $11,057 | $30,000 | Not Implemented |
ME0154 # 03 Y:1995 | 03 | 1995 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,200 | $400 | Not Implemented |
ME0154 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,527 | $1,500 | Not Implemented |