IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,221

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0635 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,794 $30,000 Implemented
NC0635 # 04 Y:2019 04 2019 REPAIR AND ELIMINATE STEAM LEAKS $2,165 $850 Implemented
LS1908 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,210 $0 Implemented
LS1908 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $64,386 $25,000 Implemented
LS1908 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,396 $21,120 Implemented
LS1908 # 05 Y:2019 05 2019 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $46,800 $30,000 Implemented
GT0928 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $17,607 $950 Implemented
GT0928 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,605 $1,741 Implemented
GT0928 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,360 $33,097 Implemented
AS0474 # 01 Y:2019 01 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $20,118 $5,404 Implemented
AS0474 # 02 Y:2019 02 2019 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $9,875 $2,238 Implemented
AS0474 # 03 Y:2019 03 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,733 $750 Implemented
AS0474 # 04 Y:2019 04 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,818 $895 Implemented
AS0474 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,935 $516 Implemented
AS0474 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $77 $0 Implemented
MZ0274 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,654 $104,076 Implemented
MZ0274 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $9,193 $4,500 Implemented
MZ0274 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,363 $2,480 Implemented
MZ0274 # 06 Y:2019 06 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,585 $3,900 Implemented
MZ0274 # 08 Y:2019 08 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $705 $1,100 Implemented
TT0223 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,339 $172,868 Implemented
UD0997 # 01 Y:2019 01 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $5,924 $0 Implemented
UD0997 # 02 Y:2019 02 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,364 $0 Implemented
UD0997 # 10 Y:2019 10 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,439 $164,220 Implemented
UD0996 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,447 $0 Implemented