Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,221
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0028 # 04 Y:2008 | 04 | 2008 | USE PHOTOCELL CONTROLS | $131 | $111 | Implemented |
UM0345 # 02 Y:2008 | 02 | 2008 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $8,397 | $1,650 | Implemented |
UM0345 # 03 Y:2008 | 03 | 2008 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,558 | $0 | Implemented |
UM0345 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,336 | $460 | Implemented |
TT0010 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,100 | $2,500 | Implemented |
TT0010 # 04 Y:2008 | 04 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,700 | $11,500 | Implemented |
TT0010 # 06 Y:2008 | 06 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $2,625 | $5,250 | Implemented |
LE0281 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,477 | $1,790 | Implemented |
LE0281 # 04 Y:2008 | 04 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,441 | $2,500 | Implemented |
LE0281 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $923 | $240 | Implemented |
IC0146 # 02 Y:2008 | 02 | 2008 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $3,159 | $0 | Implemented |
IC0146 # 03 Y:2008 | 03 | 2008 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $24,543 | $208,785 | Implemented |
IC0146 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,631 | $729 | Implemented |
IC0146 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $548 | $211 | Implemented |
IC0146 # 08 Y:2008 | 08 | 2008 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $541 | $0 | Implemented |
IC0146 # 09 Y:2008 | 09 | 2008 | INSTALL OCCUPANCY SENSORS | $1,535 | $3,688 | Implemented |
IC0146 # 10 Y:2008 | 10 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $487 | $424 | Implemented |
IC0146 # 11 Y:2008 | 11 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $679 | $0 | Implemented |
IA0433 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,622 | $459 | Implemented |
IA0433 # 03 Y:2008 | 03 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,886 | $832 | Implemented |
IA0433 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,195 | $54 | Implemented |
IA0433 # 07 Y:2008 | 07 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,364 | $4,000 | Implemented |
IA0433 # 08 Y:2008 | 08 | 2008 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $587 | $142 | Implemented |
IA0433 # 11 Y:2008 | 11 | 2008 | ADJUST VENTS TO MINIMIZE ENERGY USE | $3,380 | $294 | Implemented |
LL0300 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $53,924 | $44,605 | Implemented |