Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
845
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0550 # 11 Y:2017 | 11 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,230 | $1,100 | Implemented |
WV0550 # 12 Y:2017 | 12 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,173 | $64 | Implemented |
WV0550 # 13 Y:2017 | 13 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $2,757 | $647 | Implemented |
WV0550 # 14 Y:2017 | 14 | 2017 | USE POWER DURING OFF-PEAK PERIODS | $2,151 | $443 | Not Implemented |
WV0550 # 15 Y:2017 | 15 | 2017 | INSULATE BARE EQUIPMENT | $610 | $1,042 | Implemented |
WV0550 # 16 Y:2017 | 16 | 2017 | INSULATE BARE EQUIPMENT | $496 | $1,754 | Implemented |
UM0477 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,476 | $3,500 | n/a |
UM0477 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,012 | $1,023 | n/a |
UM0477 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $864 | $880 | n/a |
UM0477 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,640 | $9,000 | n/a |
UD0963 # 01 Y:2017 | 01 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,133 | $4,500 | Not Implemented |
UD0963 # 02 Y:2017 | 02 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,232 | $400 | Implemented |
UD0963 # 03 Y:2017 | 03 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,139 | $0 | Implemented |
UD0963 # 04 Y:2017 | 04 | 2017 | INSTALL AUTOMATIC STACK DAMPER | $1,358 | $548 | Not Implemented |
UD0963 # 05 Y:2017 | 05 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,870 | $37,000 | Not Implemented |
UD0963 # 06 Y:2017 | 06 | 2017 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $5,095 | $4,624 | Not Implemented |
UD0963 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,311 | $0 | Not Implemented |
UD0963 # 08 Y:2017 | 08 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $648 | $0 | Not Implemented |
UD0963 # 09 Y:2017 | 09 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,428 | $3,701 | Not Implemented |
UD0963 # 10 Y:2017 | 10 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,250 | $3,655 | Not Implemented |
UD0963 # 11 Y:2017 | 11 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,727 | $21,847 | Not Implemented |
UD0963 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,242 | $7,925 | Not Implemented |
UD0963 # 13 Y:2017 | 13 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $402 | $630 | Not Implemented |
UD0959 # 01 Y:2017 | 01 | 2017 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $114,753 | $0 | Not Implemented |
UD0959 # 02 Y:2017 | 02 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $19,894 | $39,000 | Not Implemented |