IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

403

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0174 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $2,789 $900 Implemented
AS0174 # 08 Y:1996 08 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,663 $8,000 Not Implemented
AS0174 # 09 Y:1996 09 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,188 $0 Implemented
OR0263 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $966 $3,352 Not Implemented
OR0263 # 05 Y:1996 05 1996 OPTIMIZE PLANT POWER FACTOR $3,319 $9,400 Not Implemented
OR0263 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,202 $7,023 Implemented
OR0263 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $14,343 $15,100 Not Implemented
OR0263 # 02 Y:1996 02 1996 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $69,830 $183,000 Not Implemented
OR0263 # 01 Y:1996 01 1996 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $61,134 $20,900 Implemented
CO0364 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,901 $64,178 Not Implemented
CO0364 # 02 Y:1996 02 1996 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $7,840 $7,000 Not Implemented
CO0364 # 03 Y:1996 03 1996 USE AUTOMATIC CLEANING EQUIPMENT $3,520 $3,600 Implemented
CO0364 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $2,220 Not Implemented
CO0364 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $570 $220 Implemented
CO0364 # 06 Y:1996 06 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $55 $60 Implemented
CO0364 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $280 $360 Implemented
IA0141 # 01 Y:1996 01 1996 USE RADIANT HEATER FOR SPOT HEATING $9,887 $1,427 Implemented
IA0141 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,108 $5,087 Not Implemented
IA0141 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $145 $1,366 Not Implemented
IA0141 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102 $296 Implemented
IA0141 # 05 Y:1996 05 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,104 $239 Not Implemented
IA0141 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $862 $25 Implemented
IA0141 # 07 Y:1996 07 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $365 $150 Implemented
IA0141 # 08 Y:1996 08 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $341 $190 Implemented
IA0141 # 09 Y:1996 09 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,350 $5,000 Not Implemented