IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

274

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0095 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,789 $800 Not Implemented
UA0095 # 03 Y:2013 03 2013 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $18,583 $59,040 Not Implemented
UA0095 # 04 Y:2013 04 2013 DISCONNECT BALLASTS $573 $324 Not Implemented
UA0095 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $562 $1,759 Not Implemented
SD0462 # 01 Y:2013 01 2013 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $99,584 $283,600 Not Implemented
SD0462 # 02 Y:2013 02 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,686 $36,750 Not Implemented
SD0462 # 03 Y:2013 03 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,741 $18,500 Not Implemented
SD0462 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,726 $2,000 Not Implemented
SD0462 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,368 $32,235 Not Implemented
SD0462 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,034 $20,023 Not Implemented
SD0462 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $2,503 $4,225 Not Implemented
SD0462 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,732 $2,035 Not Implemented
WM0020 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,644 $813 Implemented
WM0020 # 02 Y:2013 02 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $804 $1,510 Not Implemented
WM0020 # 03 Y:2013 03 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,990 $0 Implemented
WM0020 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,607 $4,693 Implemented
WM0020 # 05 Y:2013 05 2013 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $4,570 $0 Implemented
WM0020 # 06 Y:2013 06 2013 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,955 $0 Implemented
NC0476 # 01 Y:2013 01 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,129 $5,000 Implemented
NC0476 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $435 $100 Implemented
NC0476 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,322 $2,500 Not Implemented
NC0476 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $9,719 $3,000 Implemented
NC0476 # 05 Y:2013 05 2013 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,556 $7,000 Not Implemented
NC0476 # 06 Y:2013 06 2013 ELIMINATE SHIFT $688,031 $25,000 Implemented
UD0872 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $10,877 $5,000 Implemented