Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,513
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1512 # 08 Y:2015 | 08 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,248 | $7,985 | Not Implemented |
UK1512 # 09 Y:2015 | 09 | 2015 | INSULATE FEEDWATER TANK | $1,278 | $994 | Implemented |
UK1512 # 10 Y:2015 | 10 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,609 | $1,500 | Implemented |
UK1512 # 11 Y:2015 | 11 | 2015 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,535 | $530 | Not Implemented |
UK1512 # 12 Y:2015 | 12 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $277 | $475 | Not Implemented |
UM0463 # 01 Y:2015 | 01 | 2015 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $1,052,850 | $1,822,453 | Not Implemented |
UM0463 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $150,724 | $565,274 | Implemented |
UM0463 # 03 Y:2015 | 03 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,674 | $4,000 | Not Implemented |
UM0463 # 04 Y:2015 | 04 | 2015 | CONVERT TO OXYFUEL BURNERS | $3,052,580 | $1,000,000 | Not Implemented |
IA0542 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,278 | $52,119 | Not Implemented |
IA0542 # 02 Y:2015 | 02 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,430 | $24,985 | Not Implemented |
IA0542 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,837 | $4,537 | Not Implemented |
IA0542 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,232 | $328 | Not Implemented |
IA0542 # 05 Y:2015 | 05 | 2015 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,629 | $5,844 | Not Implemented |
IA0542 # 06 Y:2015 | 06 | 2015 | INSTALL OCCUPANCY SENSORS | $1,556 | $4,313 | Not Implemented |
IA0542 # 07 Y:2015 | 07 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,344 | $35 | Not Implemented |
IA0542 # 08 Y:2015 | 08 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $905 | $500 | Not Implemented |
IA0542 # 09 Y:2015 | 09 | 2015 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $485 | $180 | Not Implemented |
NC0550 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,953 | $23,900 | Not Implemented |
NC0550 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $634 | $100 | Implemented |
NC0550 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,820 | $100 | Not Implemented |
NC0550 # 04 Y:2015 | 04 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,519 | $2,100 | Not Implemented |
NC0550 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,444 | $2,700 | Not Implemented |
NC0550 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,015 | $984 | Implemented |
NC0550 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,742 | $46,719 | Implemented |