IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,513

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0543 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,738 $6,000 Not Implemented
NC0543 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,805 $100 Implemented
NC0543 # 07 Y:2015 07 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,398 $21,800 Not Implemented
NC0543 # 08 Y:2015 08 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $192 $500 Implemented
NC0543 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $311 $80 Implemented
NC0543 # 10 Y:2015 10 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $8,618 $20,000 Not Implemented
NC0543 # 11 Y:2015 11 2015 DEVELOP A REPAIR/REPLACE POLICY $2,491 $4,256 Not Implemented
NC0543 # 12 Y:2015 12 2015 USE EVAPORATION TO CONCENTRATE MATERIAL $4,794 $19,000 Not Implemented
BS0057 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,976 $14,565 Not Implemented
BS0057 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,516 $910 Not Implemented
BS0057 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,229 $6,050 Not Implemented
BS0057 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $581 $1,800 Not Implemented
BS0057 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,903 $200 Not Implemented
BS0057 # 06 Y:2015 06 2015 INSTALL TIMERS AND/OR THERMOSTATS $332 $116 Not Implemented
BS0057 # 07 Y:2015 07 2015 UPGRADE CONTROLS ON COMPRESSORS $11,687 $16,725 Not Implemented
BD0465 # 01 Y:2015 01 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,916 $28,000 Not Implemented
BD0465 # 02 Y:2015 02 2015 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $11,490 $62,000 Implemented
BD0465 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $3,705 Implemented
BD0465 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $906 $1,200 Implemented
BD0465 # 05 Y:2015 05 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $837 $648 Implemented
BD0465 # 06 Y:2015 06 2015 RECOVER WASTE HEAT FROM EQUIPMENT $330 $800 Implemented
BD0465 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $256 $305 Implemented
BD0465 # 08 Y:2015 08 2015 CLEAR AND RENT EXISTING SPACE $71,910 $2,000 Implemented
BD0465 # 09 Y:2015 09 2015 ADOPT IN-HOUSE MATERIAL GENERATION $7,962 $22,000 Not Implemented
WV0511 # 01 Y:2015 01 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $34,159 $150,000 Not Implemented