Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,523
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0278 # 10 Y:2015 | 10 | 2015 | USE OPTIMUM THICKNESS INSULATION | $711 | $610 | Implemented |
MI0278 # 11 Y:2015 | 11 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $671 | $1,880 | Implemented |
MI0278 # 01 Y:2015 | 01 | 2015 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $103,740 | $220,000 | Not Implemented |
MI0278 # 02 Y:2015 | 02 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $94,012 | $102,610 | Not Implemented |
MI0278 # 03 Y:2015 | 03 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $45,923 | $79,106 | Implemented |
MZ0170 # 01 Y:2015 | 01 | 2015 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $56,753 | $214,172 | Not Implemented |
MZ0170 # 02 Y:2015 | 02 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,189 | $17,018 | Not Implemented |
MZ0170 # 03 Y:2015 | 03 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,117 | $0 | Not Implemented |
MZ0170 # 04 Y:2015 | 04 | 2015 | CONDENSE OPERATION INTO ONE BUILDING | $11,328 | $0 | Not Implemented |
MA0744 # 01 Y:2015 | 01 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,197 | $27,500 | Not Implemented |
MA0744 # 02 Y:2015 | 02 | 2015 | OPTIMIZE PLANT POWER FACTOR | $8,840 | $12,155 | Implemented |
MA0744 # 03 Y:2015 | 03 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,413 | $39,000 | Not Implemented |
MA0744 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,325 | $1,800 | Implemented |
MA0744 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,753 | $3,460 | Not Implemented |
MA0744 # 06 Y:2015 | 06 | 2015 | REDUCE VENTILATION AIR | $2,077 | $500 | Not Implemented |
WV0500 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,981 | $10,019 | Implemented |
WV0500 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,178 | $4,647 | Implemented |
WV0500 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,013 | $20 | Implemented |
WV0500 # 04 Y:2015 | 04 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,650 | $0 | Not Implemented |
WV0500 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,477 | $0 | Implemented |
WV0500 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,390 | $11,630 | Not Implemented |
WV0500 # 07 Y:2015 | 07 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $516 | $542 | Implemented |
WV0499 # 01 Y:2015 | 01 | 2015 | INSULATE BARE EQUIPMENT | $23,483 | $3,220 | Not Implemented |
WV0499 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,029 | $21,056 | Not Implemented |
WV0499 # 03 Y:2015 | 03 | 2015 | COMBINE UTILITY METERS | $4,906 | $3,200 | Not Implemented |