IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,523

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0278 # 10 Y:2015 10 2015 USE OPTIMUM THICKNESS INSULATION $711 $610 Implemented
MI0278 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $671 $1,880 Implemented
MI0278 # 01 Y:2015 01 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $103,740 $220,000 Not Implemented
MI0278 # 02 Y:2015 02 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $94,012 $102,610 Not Implemented
MI0278 # 03 Y:2015 03 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $45,923 $79,106 Implemented
MZ0170 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $56,753 $214,172 Not Implemented
MZ0170 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,189 $17,018 Not Implemented
MZ0170 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,117 $0 Not Implemented
MZ0170 # 04 Y:2015 04 2015 CONDENSE OPERATION INTO ONE BUILDING $11,328 $0 Not Implemented
MA0744 # 01 Y:2015 01 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,197 $27,500 Not Implemented
MA0744 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $8,840 $12,155 Implemented
MA0744 # 03 Y:2015 03 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,413 $39,000 Not Implemented
MA0744 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,325 $1,800 Implemented
MA0744 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,753 $3,460 Not Implemented
MA0744 # 06 Y:2015 06 2015 REDUCE VENTILATION AIR $2,077 $500 Not Implemented
WV0500 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,981 $10,019 Implemented
WV0500 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,178 $4,647 Implemented
WV0500 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,013 $20 Implemented
WV0500 # 04 Y:2015 04 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,650 $0 Not Implemented
WV0500 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,477 $0 Implemented
WV0500 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,390 $11,630 Not Implemented
WV0500 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $516 $542 Implemented
WV0499 # 01 Y:2015 01 2015 INSULATE BARE EQUIPMENT $23,483 $3,220 Not Implemented
WV0499 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,029 $21,056 Not Implemented
WV0499 # 03 Y:2015 03 2015 COMBINE UTILITY METERS $4,906 $3,200 Not Implemented