IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,523

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0499 # 04 Y:2015 04 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,878 $1,000 Implemented
WV0499 # 05 Y:2015 05 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,187 $0 Not Implemented
WV0499 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,695 $3,343 Implemented
WV0499 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,825 $20 Implemented
WV0499 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,734 $5,450 Not Implemented
WV0499 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $792 $0 Implemented
WV0499 # 10 Y:2015 10 2015 DEVELOP A REPAIR/REPLACE POLICY $781 $569 Implemented
IP0034 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,454 $0 Implemented
IP0034 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,112 $0 Implemented
IP0034 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $111 $0 Not Implemented
IP0034 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,686 $636 Not Implemented
IP0034 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $974 $104 Not Implemented
IP0034 # 06 Y:2015 06 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,451 $845 Not Implemented
IP0034 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,425 $89,660 Not Implemented
MA0740 # 01 Y:2015 01 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,853 $200 Implemented
MA0740 # 02 Y:2015 02 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $5,057 $4,200 Implemented
MA0740 # 03 Y:2015 03 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,672 $11,200 Implemented
MA0740 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,745 $6,695 Implemented
MA0740 # 05 Y:2015 05 2015 REDUCE VENTILATION AIR $3,084 $2,450 Implemented
MA0740 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,904 $1,425 Implemented
MA0740 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,652 $5,375 Not Implemented
MA0740 # 08 Y:2015 08 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,775 $2,010 Implemented
MA0740 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $426 $500 Implemented
MZ0161 # 01 Y:2014 01 2014 UPGRADE CONTROLS ON COMPRESSORS $54,484 $150,000 Not Implemented
MZ0161 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $5,393 $11,000 Not Implemented