IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,523

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0264 # 05 Y:2014 05 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,739 $2,100 Not Implemented
MI0264 # 06 Y:2014 06 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,019 $80 Implemented
MI0264 # 07 Y:2014 07 2014 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $7,073 $1,000 Implemented
MI0264 # 08 Y:2014 08 2014 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,408 $140 Implemented
MI0264 # 09 Y:2014 09 2014 RECOVER WASTE HEAT FROM EQUIPMENT $5,031 $140 Not Implemented
MI0264 # 10 Y:2014 10 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,344 $4,800 Implemented
MI0264 # 11 Y:2014 11 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,707 $3,170 Not Implemented
MI0264 # 12 Y:2014 12 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,115 $520 Implemented
MI0264 # 13 Y:2014 13 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,870 $2,960 Not Implemented
MI0264 # 14 Y:2014 14 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,886 $1,660 Implemented
MI0264 # 15 Y:2014 15 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,646 $1,660 Implemented
MI0264 # 16 Y:2014 16 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,316 $80 Implemented
MI0264 # 17 Y:2014 17 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,179 $80 Implemented
MI0264 # 18 Y:2014 18 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,127 $80 Implemented
MI0264 # 19 Y:2014 19 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $782 $1,660 Not Implemented
MI0264 # 20 Y:2014 20 2014 INSTALL OCCUPANCY SENSORS $542 $83 Not Implemented
MI0264 # 21 Y:2014 21 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $80 Not Implemented
SD0486 # 01 Y:2014 01 2014 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $75,586 $286,300 Not Implemented
SD0486 # 02 Y:2014 02 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $54,581 $250,000 Not Implemented
SD0486 # 03 Y:2014 03 2014 REDUCE SCRAP PRODUCTION $29,967 $30,993 Not Implemented
SD0486 # 04 Y:2014 04 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,957 $4,985 Not Implemented
SD0486 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,274 $22,000 Not Implemented
SD0486 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,270 $600 Not Implemented
SD0486 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $600 Not Implemented
OK0885 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $10,088 $12,319 Implemented