Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2015 |
Principal Product | Steering and suspension parts |
NAICS | 336330 - Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $50,000,000-$100,000,000 |
# of Employees | 330 |
Plant Area (Sq.Ft.) | 144,000 |
Annual Production | 16,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $397,871 | 6,674,596 | kWh | $0.06 |
Electricity Demand | $155,485 | 12,715 | kW-months/year | $12.23 |
Natural Gas | $119,480 | 14,043 | MMBtu | $8.51 |
TOTAL ENERGY COSTS | $681,964 | |||
RECOMMENDED SAVINGS* | $144,839 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $75,788 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $64,078 Cost: $68,997 |
$46,472 | 774,534 | $17,381 | 1,549 | - | - | - | - | - | - | $225 | - |
$46,472 774,534 kWh |
$17,381 1,549 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$225 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $28,971 Cost: $40,000 |
$21,273 | 354,556 | $19,523 | 1,740 | $(-11,825) | (-1,389) | - | - | - | - | - | - |
$21,273 354,556 kWh |
$19,523 1,740 kW-months/year |
$(-11,825) (-1,389) MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,402 Cost: $100 |
$6,043 | 100,710 | $2,259 | 201 | - | - | - | - | $(-600) | - | $(-300) | - |
$6,043 100,710 kWh |
$2,259 201 kW-months/year |
- - MMBtu |
- - lb |
$(-600) - $ |
$(-300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $7,041 Cost: $10,000 |
$4,028 | 67,140 | $3,013 | 267 | - | - | - | - | - | - | - | - |
$4,028 67,140 kWh |
$3,013 267 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $7,738 Cost: $6,000 |
$5,632 | 93,862 | $2,106 | 188 | - | - | - | - | - | - | - | - |
$5,632 93,862 kWh |
$2,106 188 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,805 Cost: $100 |
$2,769 | 46,158 | $1,036 | 92 | - | - | - | - | - | - | - | - |
$2,769 46,158 kWh |
$1,036 92 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $9,398 Cost: $21,800 |
$6,840 | 114,000 | $2,558 | 228 | - | - | - | - | - | - | - | - |
$6,840 114,000 kWh |
$2,558 228 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $192 Cost: $500 |
$192 | 3,198 | - | - | - | - | - | - | - | - | - | - |
$192 3,198 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $311 Cost: $80 |
$128 | 2,137 | $33 | 3 | - | - | - | - | - | - | $150 | - |
$128 2,137 kWh |
$33 3 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$150 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $8,618 Cost: $20,000 |
$8,618 | 143,640 | - | - | - | - | - | - | - | - | - | - |
$8,618 143,640 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $2,491 Cost: $4,256 |
$1,813 | 30,211 | $678 | 60 | - | - | - | - | - | - | - | - |
$1,813 30,211 kWh |
$678 60 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $4,794 Cost: $19,000 |
- | - | - | - | $(-1,287) | (-151) | $6,081 | 108,600 | - | - | - | - |
- - kWh |
- - kW-months/year |
$(-1,287) (-151) MMBtu |
$6,081 108,600 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $144,839 Cost: $190,833 |
$103,808 | 1,730,146 | $48,587 | 4,328 | $(-13,112) | (-1,540) | $6,081 | 108,600 | $(-600) | - | $75 | - | $103,808 1,730,146 kWh |
$48,587 4,328 kW-months/year |
$(-13,112) (-1,540) MMBtu |
$6,081 108,600 lb |
$(-600) - $ |
$75 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $75,788 Cost: $69,777 |
$55,604 | 926,737 | $20,709 | 1,845 | - | - | - | - | $(-600) | - | $75 | - | $55,604 926,737 kWh |
$20,709 1,845 kW-months/year |
- - MMBtu |
- - lb |
$(-600) - $ |
$75 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost |