Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,504
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0212 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $698 | $1,730 | n/a |
WM0212 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $568 | $0 | n/a |
WM0212 # 05 Y:2024 | 05 | 2024 | USE COMPRESSOR AIR FILTERS | $239 | $573 | n/a |
MZ0356 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $519 | $415 | Implemented |
MZ0356 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,731 | $440 | Not Implemented |
MZ0356 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,176 | $63,400 | Not Implemented |
MZ0356 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,117 | $14,802 | Implemented |
MZ0356 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,120 | $2,680 | Implemented |
MZ0356 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $525,252 | $3,450,533 | Not Implemented |
MZ0356 # 07 Y:2023 | 07 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $135,000 | $306,035 | Not Implemented |
MZ0356 # 08 Y:2023 | 08 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,202 | $7,540 | Not Implemented |
MZ0356 # 09 Y:2023 | 09 | 2023 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $10,677 | $100,000 | Not Implemented |
UF0608 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $100,291 | $322,608 | n/a |
UF0608 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,445 | $25,640 | n/a |
UF0608 # 03 Y:2023 | 03 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,437 | $3,636 | n/a |
UF0608 # 04 Y:2023 | 04 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,417 | $9,340 | n/a |
UF0608 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,526 | $10,560 | n/a |
UF0608 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,789 | $7,200 | n/a |
UF0608 # 07 Y:2023 | 07 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $1,138 | $5,400 | n/a |
SD0648 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,994 | $4,000 | Implemented |
SD0648 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,906 | $4,828 | Implemented |
SD0648 # 03 Y:2024 | 03 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $15,800 | $12,200 | Not Implemented |
SD0648 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $113,272 | $30,051 | Implemented |
SD0648 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $824,443 | $529,751 | Not Implemented |
SD0648 # 06 Y:2024 | 06 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $409,025 | $0 | Not Implemented |