IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,523

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0230 # 09 Y:1999 09 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $1,308 $2,270 Not Implemented
KU0536 # 01 Y:1999 01 1999 REPLACE BOILER $10,770 $29,000 n/a
KU0536 # 02 Y:1999 02 1999 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $8,260 $37,800 n/a
KU0536 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,240 $23,220 n/a
KU0536 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,450 $5,290 n/a
KU0536 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $370 $40 n/a
KU0536 # 06 Y:1999 06 1999 IMPROVE SPACE COMFORT CONDITIONING $34,860 $75,000 n/a
MA0453 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $60,085 $139,425 Not Implemented
MA0453 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $38,897 $96,900 Not Implemented
MA0453 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $19,476 $45,000 Not Implemented
MA0453 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,766 $19,425 Not Implemented
MA0453 # 05 Y:1999 05 1999 USE LESS WASTEFUL PACKAGING $8,714 $15,000 Not Implemented
MA0453 # 06 Y:1999 06 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,433 $10,115 Not Implemented
IA0232 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,704 $13,064 Not Implemented
IA0232 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,087 $445 Not Implemented
IA0232 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,827 $537 Implemented
IA0232 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $704 $828 Not Implemented
IA0232 # 05 Y:1999 05 1999 CONVERT TO ELECTROSTATIC POWDER COATING $150,000 $28,000 Not Implemented
IA0232 # 06 Y:1999 06 1999 RECYCLE CLEANING SOLVENT AND REUSE $33,891 $10,300 Implemented
IA0232 # 07 Y:1999 07 1999 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE $9,540 $16,088 Not Implemented
IA0232 # 08 Y:1999 08 1999 MOVE PRODUCT USING MECHANICAL MEANS $31,898 $175,500 Not Implemented
TP0008 # 01 Y:1999 01 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $24,189 $1,848 Implemented
TP0008 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $33,041 $51,500 Not Implemented
TP0008 # 03 Y:1999 03 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $36,820 $1,728 Not Implemented
TP0008 # 04 Y:1999 04 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $7,545 $2,000 Not Implemented