IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,523

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0273 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,366 $2,851 Not Implemented
IC0273 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,794 $4,100 Not Implemented
IC0273 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $879 $841 Not Implemented
IC0273 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $200 $35 Not Implemented
IC0273 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $279,174 $2,543,426 Not Implemented
TT0284 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,705 $50,300 Not Implemented
TT0284 # 02 Y:2023 02 2023 MINIMIZE WATER USAGE $10,675 $240 Implemented
TT0284 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $8,764 $13,000 Implemented
TT0284 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,557 $3,205 Not Implemented
TT0284 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $7,905 $7,500 Not Implemented
TT0284 # 06 Y:2023 06 2023 AIR CONDITION ONLY SPACE NECESSARY $3,153 $6,000 Not Implemented
TT0284 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,804 $10,150 Implemented
TT0284 # 08 Y:2023 08 2023 OPTIMIZE PLANT POWER FACTOR $2,266 $3,750 Not Implemented
TT0284 # 09 Y:2023 09 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,087 $1,600 Not Implemented
TT0284 # 10 Y:2023 10 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,028 $60 Not Implemented
OK1083 # 01 Y:2023 01 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,764 $522 Not Implemented
OK1083 # 02 Y:2023 02 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,133 $12,880 Not Implemented
OK1083 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $29 $123 Implemented
OK1083 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $491,204 $4,927,139 Not Implemented
OK1083 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $926 $2,799 Implemented
UW2214 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,351 $2,080 Not Implemented
UW2214 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $843 $970 Not Implemented
UW2214 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,014 $0 Not Implemented
IP0163 # 01 Y:2022 01 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $241 $0 Implemented
IP0163 # 02 Y:2022 02 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $24,564 $0 Not Implemented