IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,513

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0157 # 11 Y:1995 11 1995 REDUCE SCRAP PRODUCTION $37,800 $1,250 Not Implemented
BD0034 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $36,269 $34,000 Implemented
BD0034 # 02 Y:1995 02 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,656 $6,500 Not Implemented
BD0034 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $225 $300 Not Implemented
BD0034 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $945 $2,910 Not Implemented
BD0034 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $1,975 $450 Not Implemented
BD0034 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $403 $546 Not Implemented
BD0034 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $263 $350 Not Implemented
AS0155 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $418 $500 Not Implemented
AS0155 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,821 $750 Implemented
AS0155 # 03 Y:1995 03 1995 USE SYNTHETIC LUBRICANT $1,941 $0 Implemented
AS0155 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,414 $36,039 Not Implemented
AS0155 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $855 $2,592 Not Implemented
AS0155 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $315 $500 Not Implemented
AS0155 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $859 $368 Not Implemented
AS0155 # 08 Y:1995 08 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,336 $9,686 Not Implemented
AS0155 # 09 Y:1995 09 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $310 $0 Not Implemented
AS0155 # 10 Y:1995 10 1995 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $2,007 $10,000 Not Implemented
DS0034 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,623 $6,146 Not Implemented
DS0034 # 02 Y:1995 02 1995 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $17,652 $40,496 Not Implemented
DS0034 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,356 $17,400 Not Implemented
DS0034 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $294 $192 Not Implemented
AR0064 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,704 $500 Implemented
AR0064 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $694 $1,000 Implemented
AR0064 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $892 $416 Implemented