IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,262

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0106 # 09 Y:1983 09 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,291 $7,951 Not Implemented
KU0106 # 10 Y:1983 10 1983 INSTALL TIMERS AND/OR THERMOSTATS $12,782 $10 Not Implemented
KU0106 # 11 Y:1983 11 1983 REDUCE VENTILATION AIR $1,554 $0 Not Implemented
TN0169 # 01 Y:1983 01 1983 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $5,500 $50,000 Not Implemented
TN0169 # 02 Y:1983 02 1983 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $800 $0 Not Implemented
TN0169 # 03 Y:1983 03 1983 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,500 $0 Not Implemented
TN0150 # 01 Y:1982 01 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $662 $492 Not Implemented
TN0150 # 02 Y:1982 02 1982 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,328 $0 Not Implemented
TN0150 # 03 Y:1982 03 1982 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $2,926 $1,563 Not Implemented
UD0042 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,309 $1,610 Implemented
UD0042 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,870 $1,450 Implemented
UD0042 # 03 Y:1982 03 1982 INSTALL TIMERS AND/OR THERMOSTATS $6,580 $139 Implemented
UD0042 # 04 Y:1982 04 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,997 $0 Implemented
UD0042 # 05 Y:1982 05 1982 REDUCE GLAZED AREAS IN BUILDINGS $1,633 $3,410 Implemented
UD0042 # 06 Y:1982 06 1982 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $866 $4,000 Implemented
TN0130 # 01 Y:1982 01 1982 TURN OFF EQUIPMENT WHEN NOT IN USE $15,419 $3,500 Not Implemented
TN0130 # 02 Y:1982 02 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $7,571 $5,400 Not Implemented
TN0130 # 03 Y:1982 03 1982 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,269 $1,000 Not Implemented
TN0130 # 04 Y:1982 04 1982 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,775 $3,320 Not Implemented
KU0034 # 01 Y:1982 01 1982 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,130 $6,000 Not Implemented
KU0034 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,770 $3,635 Not Implemented
KU0034 # 03 Y:1982 03 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,680 $0 Not Implemented
KU0034 # 04 Y:1982 04 1982 OPTIMIZE PLANT POWER FACTOR $1,240 $1,600 Not Implemented
KU0034 # 05 Y:1982 05 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $450 $869 Not Implemented
KU0034 # 06 Y:1982 06 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $315 $700 Not Implemented