IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

471

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0236 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,924 $30,183 Implemented
IC0236 # 02 Y:2020 02 2020 BURN WOOD BY-PRODUCTS FOR HEAT $42,806 $9,522 Not Implemented
IC0236 # 03 Y:2020 03 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,481 $0 Implemented
IC0236 # 04 Y:2020 04 2020 USE RADIANT HEATER FOR SPOT HEATING $7,794 $18,280 Not Implemented
IC0236 # 05 Y:2020 05 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $77,665 $110,000 Not Implemented
IC0236 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,626 $4,075 Implemented
IC0236 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,304 $100 Not Implemented
IP0102 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,210 $0 Not Implemented
IP0102 # 02 Y:2018 02 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $136 $0 Not Implemented
IP0102 # 03 Y:2018 03 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $10 $0 Not Implemented
IP0102 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $759 $629 Not Implemented
IP0102 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,705 $10,744 Not Implemented
IP0102 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,737 $35,615 Not Implemented
IP0092 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $112,756 $41,810 Implemented
IP0092 # 06 Y:2017 06 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,898 $1,119 Implemented
IP0092 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $635 $42 Implemented
IP0092 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $546 $31 Implemented
IP0092 # 03 Y:2017 03 2017 PAY BILLS ON TIME TO AVOID LATE FEES $7,288 $0 Implemented
IP0092 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $876 $0 Implemented
IP0092 # 01 Y:2017 01 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,211 $0 Implemented
UD0977 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,684 $6,500 Implemented
UD0977 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,960 $0 Implemented
UD0977 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,231 $0 Implemented
UD0977 # 04 Y:2017 04 2017 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $47,239 $23,800 Not Implemented
UD0977 # 05 Y:2017 05 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $34,880 $0 Not Implemented