IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

184

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0294 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,995 $1,245 Not Implemented
SU0294 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,763 $1,440 Implemented
SU0294 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $492 Implemented
SU0294 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $142 $817 Implemented
SU0294 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $1,808 $9,734 Not Implemented
SU0294 # 08 Y:2010 08 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,680 $17,732 Not Implemented
SU0294 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $108 $516 Not Implemented
SU0294 # 10 Y:2010 10 2010 UPGRADE OBSOLETE EQUIPMENT $276 $1,831 Implemented
SU0289 # 01 Y:2010 01 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,013 $0 Implemented
SU0289 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,573 $0 Implemented
SU0289 # 03 Y:2010 03 2010 PAY BILLS ON TIME TO AVOID LATE FEES $1,552 $0 Implemented
SU0289 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,383 $578 Implemented
SU0289 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,787 $964 Not Implemented
SU0289 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $1,653 $1,236 Implemented
SU0289 # 07 Y:2010 07 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $528 $714 Implemented
SU0289 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,267 $8,373 Not Implemented
SU0268 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,465 $0 Not Implemented
SU0268 # 02 Y:2008 02 2008 PAY BILLS ON TIME TO AVOID LATE FEES $854 $0 Not Implemented
SU0268 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $22,823 $1,071 Implemented
SU0268 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,511 $1,250 Implemented
SU0268 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $310 $385 Implemented
SU0268 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,769 $83,044 Implemented
SU0268 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $781 $1,451 Not Implemented
SU0268 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $318 $674 Implemented
SU0268 # 09 Y:2008 09 2008 OPTIMIZE PLANT POWER FACTOR $11,006 $39,533 Not Implemented