IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

845

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1031 # 09 Y:2022 09 2022 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $6,625 $5,000 Not Implemented
UD1031 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,888 $23,132 Not Implemented
UD1031 # 11 Y:2022 11 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $909 $0 Implemented
UD1031 # 12 Y:2022 12 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,847 $1,000 Not Implemented
UD1031 # 13 Y:2022 13 2022 OPTIMIZE PLANT POWER FACTOR $1,446 $4,227 Not Implemented
UD1031 # 14 Y:2022 14 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,264 $7,500 Not Implemented
UD1031 # 15 Y:2022 15 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,659 $7,500 Not Implemented
UD1030 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,340 $0 Implemented
UD1030 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $281 $0 Not Implemented
UD1030 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,468 $4,319 Not Implemented
UD1030 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,026 $340 Implemented
UD1030 # 05 Y:2021 05 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,569 $35 Not Implemented
UD1030 # 06 Y:2021 06 2021 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,833 $4,000 Not Implemented
UD1030 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,553 $21,607 Implemented
UD1030 # 08 Y:2021 08 2021 INSULATE BARE EQUIPMENT $20,126 $28,000 Implemented
UD1030 # 09 Y:2021 09 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,747 $7,500 Not Implemented
UD1006 # 01 Y:2019 01 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $44,647 $16,500 Implemented
UD1006 # 02 Y:2019 02 2019 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $125,929 $30,000 Not Implemented
UD1006 # 03 Y:2019 03 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $27,201 $54,202 Not Implemented
UD1006 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $50,796 $0 Not Implemented
UD1006 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $8,839 $3,770 Not Implemented
UD1006 # 06 Y:2019 06 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,275 $16,696 Not Implemented
UD1000 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,280 $0 Implemented
UD1000 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,606 $0 Not Implemented
UD1000 # 03 Y:2019 03 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,599 $0 Implemented