IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

281

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0690 # 02 Y:2000 02 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $164,990 $183,505 Implemented
TN0690 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $93,903 $3,930 Implemented
TN0690 # 04 Y:2000 04 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $72,100 $0 Not Implemented
TN0690 # 05 Y:2000 05 2000 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $29,370 $9,805 Not Implemented
TN0690 # 06 Y:2000 06 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $32,000 $13,020 Not Implemented
TN0690 # 07 Y:2000 07 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $17,200 $5,810 Not Implemented
TN0690 # 08 Y:2000 08 2000 RECOVER WASTE HEAT FROM EQUIPMENT $14,310 $33,160 Not Implemented
TN0690 # 09 Y:2000 09 2000 COVER OPEN TANKS $4,705 $2,280 Not Implemented
UL0230 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,394 $40 Implemented
UL0230 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,353 $500 Implemented
UL0230 # 03 Y:1999 03 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,860 $0 Not Implemented
UL0230 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,447 $0 Not Implemented
UL0230 # 05 Y:1999 05 1999 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $297,462 $167,000 Not Implemented
UL0230 # 06 Y:1999 06 1999 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $83,800 $80,000 Implemented
UL0230 # 07 Y:1999 07 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $1,500 $0 Implemented
UL0230 # 08 Y:1999 08 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $2,893 $2,120 Implemented
UL0230 # 09 Y:1999 09 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $1,308 $2,270 Not Implemented
TN0665 # 01 Y:1999 01 1999 MODIFY CURRENT INCENTIVE PROGRAM $18,750 $30,000 n/a
TN0665 # 02 Y:1999 02 1999 RECOVER AND REUSE WASTE MATERIAL $13,460 $2,860 n/a
TN0665 # 03 Y:1999 03 1999 RECOVER AND REUSE WASTE MATERIAL $11,520 $6,670 n/a
TN0665 # 04 Y:1999 04 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $6,880 $480 n/a
TN0665 # 05 Y:1999 05 1999 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $6,106 $14,800 n/a
TN0665 # 06 Y:1999 06 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,870 $3,144 n/a
TN0665 # 07 Y:1999 07 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,005 $2,500 n/a
TN0665 # 08 Y:1999 08 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $565 $0 n/a