Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
496
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0015 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,301 | $7,684 | n/a |
SJ0015 # 09 Y:2024 | 09 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $146,431 | $0 | n/a |
SJ0015 # 08 Y:2024 | 08 | 2024 | COMBINE UTILITY METERS | $1,748 | $0 | n/a |
SJ0015 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $179,675 | $962,431 | n/a |
SJ0015 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $676 | $680 | n/a |
SJ0015 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,620 | $1,986 | n/a |
SJ0015 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,763 | $0 | n/a |
SJ0015 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,211 | $98 | n/a |
SJ0015 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,809 | $766 | n/a |
SD0648 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,994 | $4,000 | Implemented |
SD0648 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $35,974 | $2,600 | Implemented |
SD0648 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $824,443 | $529,751 | Not Implemented |
SD0648 # 06 Y:2024 | 06 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $409,025 | $0 | Not Implemented |
SD0648 # 13 Y:2024 | 13 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $793 | $1,336 | Implemented |
SD0648 # 03 Y:2024 | 03 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $15,800 | $12,200 | Not Implemented |
SD0648 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,384 | $2,234 | Implemented |
SD0648 # 10 Y:2024 | 10 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,121 | $10,016 | Implemented |
SD0648 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $113,272 | $30,051 | Implemented |
SD0648 # 09 Y:2024 | 09 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $364,878 | $49,250 | Not Implemented |
SD0648 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,340 | $15,608 | Implemented |
SD0648 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,906 | $4,828 | Implemented |
SD0648 # 12 Y:2024 | 12 | 2024 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $982,749 | $783,575 | Not Implemented |
CI0019 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $851 | $1,500 | n/a |
CI0019 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,444 | $200 | n/a |
CI0019 # 05 Y:2023 | 05 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,769 | $3,500 | n/a |