Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
74
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0723 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,158 | $1,250 | Implemented |
MA0723 # 04 Y:2014 | 04 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $11,047 | $32,000 | Not Implemented |
MA0723 # 03 Y:2014 | 03 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $16,628 | $5,000 | Implemented |
MA0723 # 01 Y:2014 | 01 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $23,304 | $90,000 | Implemented |
MA0723 # 02 Y:2014 | 02 | 2014 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $20,745 | $110,500 | Implemented |
MA0607 # 01 Y:2006 | 01 | 2006 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $46,963 | $0 | Not Implemented |
MA0607 # 02 Y:2006 | 02 | 2006 | REDUCE VENTILATION AIR | $45,943 | $10,400 | Not Implemented |
MA0607 # 03 Y:2006 | 03 | 2006 | BURN A LESS EXPENSIVE GRADE OF FUEL | $14,261 | $5,500 | Not Implemented |
MA0607 # 04 Y:2006 | 04 | 2006 | REDUCE VENTILATION AIR | $12,889 | $1,700 | Not Implemented |
MA0607 # 05 Y:2006 | 05 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $12,223 | $14,000 | Not Implemented |
MA0607 # 06 Y:2006 | 06 | 2006 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $10,577 | $1,870 | Not Implemented |
MA0607 # 07 Y:2006 | 07 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,860 | $3,500 | Not Implemented |
MA0563 # 02 Y:2004 | 02 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,769 | $650 | Implemented |
MA0563 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $116 | $0 | Implemented |
MA0563 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $257 | $155 | Not Implemented |
MA0563 # 01 Y:2004 | 01 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $39,550 | $12,000 | Implemented |
ME0238 # 01 Y:1998 | 01 | 1998 | INSTALL REPLACEMENT DOORS | $4,297 | $8,000 | Not Implemented |
ME0238 # 07 Y:1998 | 07 | 1998 | PAY UTILITY BILLS ON TIME | $176 | $0 | Implemented |
ME0238 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,607 | $17,669 | Implemented |
ME0238 # 04 Y:1998 | 04 | 1998 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,583 | $3,576 | Not Implemented |
ME0238 # 05 Y:1998 | 05 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $747 | $2,209 | Implemented |
ME0238 # 03 Y:1998 | 03 | 1998 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,854 | $10,432 | Not Implemented |
ME0238 # 10 Y:1998 | 10 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $1,637 | $0 | Implemented |
ME0238 # 06 Y:1998 | 06 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $306 | $1,090 | Not Implemented |
ME0238 # 08 Y:1998 | 08 | 1998 | PAY UTILITY BILLS ON TIME | $87 | $0 | Implemented |