IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

124

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0212 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $698 $1,730 n/a
WM0212 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $568 $0 n/a
WM0212 # 05 Y:2024 05 2024 USE COMPRESSOR AIR FILTERS $239 $573 n/a
WM0212 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $886 $2,650 n/a
WM0212 # 01 Y:2024 01 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,593 $0 n/a
WM0127 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,300 $9,602 Not Implemented
WM0127 # 05 Y:2018 05 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,828 $0 Implemented
WM0127 # 01 Y:2018 01 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $36,186 $37,500 Not Implemented
WM0127 # 02 Y:2018 02 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $18,171 $48,514 Not Implemented
WM0127 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,136 $2,000 Not Implemented
WM0127 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $2,412 $666 Not Implemented
WM0127 # 10 Y:2018 10 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $600 $1,511 Implemented
WM0127 # 07 Y:2018 07 2018 USE RADIANT HEATER FOR SPOT HEATING $2,840 $2,472 Not Implemented
WM0127 # 06 Y:2018 06 2018 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,944 $3,500 Not Implemented
WM0127 # 11 Y:2018 11 2018 USE PHOTOCELL CONTROLS $256 $47 Not Implemented
WM0127 # 09 Y:2018 09 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,110 $0 Implemented
WM0041 # 04 Y:2014 04 2014 USE SYNTHETIC LUBRICANT $2,025 $868 Not Implemented
WM0041 # 03 Y:2014 03 2014 USE HEAT PUMP FOR SPACE CONDITIONING $6,061 $28,350 Not Implemented
WM0041 # 05 Y:2014 05 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,016 $7,200 Implemented
WM0041 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,140 $2,510 Implemented
WM0041 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $330 $100 Implemented
WM0033 # 01 Y:2013 01 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $24,320 $57,920 Not Implemented
WM0033 # 07 Y:2013 07 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $204 $273 Not Implemented
WM0033 # 04 Y:2013 04 2013 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,441 $5,000 Implemented
WM0033 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $93 $315 Implemented