Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
330
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0659 # 02 Y:1999 | 02 | 1999 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $3,484 | $0 | n/a |
GT0659 # 03 Y:1999 | 03 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $37,040 | $10,000 | n/a |
GT0659 # 06 Y:1999 | 06 | 1999 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $45,013 | $120,000 | n/a |
GT0659 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,706 | $22,711 | n/a |
GT0659 # 01 Y:1999 | 01 | 1999 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $88,180 | $220,000 | n/a |
GT0659 # 04 Y:1999 | 04 | 1999 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $3,123 | $400 | n/a |
GT0678 # 05 Y:1999 | 05 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,447 | $21,000 | Not Implemented |
GT0678 # 08 Y:1999 | 08 | 1999 | COMBINE UTILITY METERS | $7,560 | $7,500 | Not Implemented |
GT0678 # 06 Y:1999 | 06 | 1999 | TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS | $35,980 | $0 | Implemented |
GT0678 # 07 Y:1999 | 07 | 1999 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $44,185 | $120,000 | Not Implemented |
GT0678 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,400 | $0 | Not Implemented |
GT0678 # 01 Y:1999 | 01 | 1999 | METER WASTE WATER | $4,925 | $900 | Implemented |
GT0678 # 02 Y:1999 | 02 | 1999 | REDUCE EXCESSIVE BOILER BLOWDOWN | $920 | $900 | Not Implemented |
GT0678 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,880 | $3,500 | Not Implemented |
UL0230 # 09 Y:1999 | 09 | 1999 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $1,308 | $2,270 | Not Implemented |
UL0230 # 06 Y:1999 | 06 | 1999 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $83,800 | $80,000 | Implemented |
UL0230 # 07 Y:1999 | 07 | 1999 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $1,500 | $0 | Implemented |
UL0230 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,394 | $40 | Implemented |
UL0230 # 04 Y:1999 | 04 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,447 | $0 | Not Implemented |
UL0230 # 03 Y:1999 | 03 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,860 | $0 | Not Implemented |
UL0230 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,353 | $500 | Implemented |
UL0230 # 05 Y:1999 | 05 | 1999 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $297,462 | $167,000 | Not Implemented |
UL0230 # 08 Y:1999 | 08 | 1999 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $2,893 | $2,120 | Implemented |
KU0536 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,240 | $23,220 | n/a |
KU0536 # 05 Y:1999 | 05 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $370 | $40 | n/a |