Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,374
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0229 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $755 | $400 | Not Implemented |
WV0229 # 07 Y:2001 | 07 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $861 | $400 | Not Implemented |
WV0229 # 08 Y:2001 | 08 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,323 | $1,200 | Implemented |
WV0229 # 09 Y:2001 | 09 | 2001 | INSTALL SPECTRAL REFLECTORS / DELAMP | $6,189 | $11,368 | Not Implemented |
WV0229 # 10 Y:2001 | 10 | 2001 | INSTALL OCCUPANCY SENSORS | $2,118 | $450 | Not Implemented |
WV0229 # 11 Y:2001 | 11 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,192 | $100 | Implemented |
WV0229 # 12 Y:2001 | 12 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $13,680 | $220 | Implemented |
WV0229 # 13 Y:2001 | 13 | 2001 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $45,000 | $15,000 | Implemented |
WV0229 # 14 Y:2001 | 14 | 2001 | ADVERTISE PRODUCT OR SERVICE | $13,200 | $2,000 | Implemented |
UM0197 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,283 | $21,862 | Implemented |
UM0197 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,532 | $825 | Implemented |
UM0197 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,898 | $1,000 | Implemented |
UM0197 # 04 Y:2001 | 04 | 2001 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $21,000 | $60,000 | Not Implemented |
UM0197 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $180 | $100 | Not Implemented |
UM0197 # 06 Y:2001 | 06 | 2001 | MINIMIZE WATER USAGE | $44,000 | $22,000 | Implemented |
MI0019 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $20,022 | $10,000 | n/a |
MI0019 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,044 | $312 | n/a |
MI0019 # 03 Y:2001 | 03 | 2001 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $8,400 | $2,000 | n/a |
MI0019 # 04 Y:2001 | 04 | 2001 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,290 | $2,530 | n/a |
MI0019 # 05 Y:2001 | 05 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,266 | $14,000 | n/a |
MI0019 # 06 Y:2001 | 06 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,991 | $288 | n/a |
MI0013 # 01 Y:2001 | 01 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $1,255 | $710 | Not Implemented |
MI0013 # 02 Y:2001 | 02 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $114,000 | $32,515 | Not Implemented |
MI0013 # 03 Y:2001 | 03 | 2001 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $3,000 | $5,000 | Not Implemented |
MI0013 # 04 Y:2001 | 04 | 2001 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $6,641 | $1,050 | Not Implemented |