Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,347

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0065 # 08 Y:2022 08 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,026 $43 Not Implemented
NL0065 # 09 Y:2022 09 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,199 $4,780 Not Implemented
NL0065 # 10 Y:2022 10 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,554 $5,468 Implemented
NL0065 # 11 Y:2022 11 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $990 $943 Not Implemented
MZ0324 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,260 $480 Implemented
MZ0324 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,050 $7,800 Implemented
MZ0324 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $269 $340 Implemented
MZ0324 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,278 $240 Implemented
MZ0324 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,182 $17,137 Not Implemented
MZ0324 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $65,010 $664,200 Not Implemented
UF0572 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $56,857 $359,360 Implemented
UF0572 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $27,950 $26,859 Implemented
UF0572 # 03 Y:2022 03 2022 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $4,159 $10,627 Implemented
UF0572 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,152 $3,218 Implemented
UF0572 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $4,007 $8,760 Implemented
UF0572 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,414 $756 Implemented
UF0572 # 07 Y:2022 07 2022 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,245 $11,975 Implemented
UF0572 # 08 Y:2022 08 2022 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,635 $4,650 Implemented
UA0248 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,182 $9,020 Implemented
UA0248 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,679 $2,002 Implemented
UA0248 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,366 $100 Not Implemented
UA0248 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $94 $274 Implemented
IC0252 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,022 $4,053 Not Implemented
IC0252 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,710 $5,524 Not Implemented
IC0252 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $16,762 $27,372 Not Implemented