Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,374
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0195 # 02 Y:2017 | 02 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,938 | $3,125 | Not Implemented |
IC0195 # 03 Y:2017 | 03 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $881 | $60 | Not Implemented |
IC0195 # 04 Y:2017 | 04 | 2017 | USE MINIMUM STEAM OPERATING PRESSURE | $457 | $0 | Not Implemented |
IC0195 # 05 Y:2017 | 05 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $49 | $6 | Not Implemented |
IC0195 # 06 Y:2017 | 06 | 2017 | REPLACE BOILER | $183,000 | $30,000 | Implemented |
IC0195 # 07 Y:2017 | 07 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $32,126 | $16,175 | Not Implemented |
IC0195 # 08 Y:2017 | 08 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $3,210 | $2,555 | Not Implemented |
IC0195 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,417 | $5,650 | Implemented |
IC0195 # 10 Y:2017 | 10 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,782 | $11,163 | Implemented |
IC0195 # 11 Y:2017 | 11 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $697,569 | $2,619,820 | Not Implemented |
IP0084 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,043 | $0 | Not Implemented |
IP0084 # 02 Y:2017 | 02 | 2017 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $131 | $0 | Implemented |
IP0084 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $383 | $4 | Not Implemented |
IP0084 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,458 | $65 | Implemented |
IP0084 # 05 Y:2017 | 05 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,415 | $130 | Implemented |
IP0084 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,221 | $290 | Implemented |
IP0084 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $974 | $203 | Implemented |
IP0084 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,534 | $928 | Not Implemented |
IP0084 # 09 Y:2017 | 09 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $910 | $416 | Not Implemented |
IP0084 # 10 Y:2017 | 10 | 2017 | APPLY FOR INVESTMENT INCENTIVES | $238 | $125 | Not Implemented |
IP0084 # 11 Y:2017 | 11 | 2017 | INSTALL OCCUPANCY SENSORS | $3,393 | $2,038 | Implemented |
IP0084 # 12 Y:2017 | 12 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $519 | $727 | Not Implemented |
IP0084 # 13 Y:2017 | 13 | 2017 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $446 | $1,250 | Implemented |
IP0084 # 14 Y:2017 | 14 | 2017 | OPTIMIZE PLANT POWER FACTOR | $13,460 | $43,320 | Not Implemented |
IP0084 # 15 Y:2017 | 15 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,680 | $25,865 | Implemented |