IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,366

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1512 # 10 Y:2015 10 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,609 $1,500 Implemented
UK1512 # 11 Y:2015 11 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,535 $530 Not Implemented
UK1512 # 12 Y:2015 12 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $277 $475 Not Implemented
UM0463 # 01 Y:2015 01 2015 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $1,052,850 $1,822,453 Not Implemented
UM0463 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150,724 $565,274 Implemented
UM0463 # 03 Y:2015 03 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,674 $4,000 Not Implemented
UM0463 # 04 Y:2015 04 2015 CONVERT TO OXYFUEL BURNERS $3,052,580 $1,000,000 Not Implemented
IA0542 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,278 $52,119 Not Implemented
IA0542 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,430 $24,985 Not Implemented
IA0542 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,837 $4,537 Not Implemented
IA0542 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,232 $328 Not Implemented
IA0542 # 05 Y:2015 05 2015 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,629 $5,844 Not Implemented
IA0542 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $1,556 $4,313 Not Implemented
IA0542 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,344 $35 Not Implemented
IA0542 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $905 $500 Not Implemented
IA0542 # 09 Y:2015 09 2015 DIRECT WARMEST AIR TO COMBUSTION INTAKE $485 $180 Not Implemented
NC0550 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,953 $23,900 Not Implemented
NC0550 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $634 $100 Implemented
NC0550 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,820 $100 Not Implemented
NC0550 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,519 $2,100 Not Implemented
NC0550 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,444 $2,700 Not Implemented
NC0550 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,015 $984 Implemented
NC0550 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,742 $46,719 Implemented
NC0550 # 08 Y:2015 08 2015 USE PHOTOCELL CONTROLS $382 $150 Not Implemented
NC0550 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $316 $868 Not Implemented