Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0564 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $29 $79 Implemented
AS0564 # 06 Y:2023 06 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $463 $71 Not Implemented
AS0564 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $945 $110 Not Implemented
AS0564 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,251 $143 Implemented
AS0564 # 03 Y:2023 03 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,752 $63 Implemented
AS0564 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,294 $1,654 Implemented
AS0564 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $30,388 $182,064 Not Implemented
AS0541 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $116,802 $60,350 Not Implemented
AS0541 # 05 Y:2022 05 2022 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $484 $840 Not Implemented
AS0541 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $253 $1,056 Not Implemented
AS0541 # 03 Y:2022 03 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $357 $826 Not Implemented
AS0541 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,906 $8,806 Not Implemented
SD0402 # 08 Y:2008 08 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,363 $900 Implemented
SD0402 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,958 $11,073 Not Implemented
SD0402 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $125,747 $39,474 Not Implemented
SD0402 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,987 $130,635 Not Implemented
SD0402 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,170 $88,300 Not Implemented
SD0402 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,796 $46,094 Not Implemented
SD0402 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,282 $11,175 Not Implemented
SD0402 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,022 $11,175 Implemented
AS0251 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $393 $825 Not Implemented
AS0251 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $711 $3,018 Implemented
AS0251 # 08 Y:1999 08 1999 SCHEDULE DELIVERIES ACCORDING TO DEMAND $124,999 $146,360 Not Implemented
AS0251 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $6,862 $30 Not Implemented
AS0251 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $270,903 $520,000 Not Implemented