Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
151
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL0230 # 05 Y:1999 | 05 | 1999 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $297,462 | $167,000 | Not Implemented |
UL0230 # 04 Y:1999 | 04 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,447 | $0 | Not Implemented |
UL0230 # 06 Y:1999 | 06 | 1999 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $83,800 | $80,000 | Implemented |
UL0230 # 09 Y:1999 | 09 | 1999 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $1,308 | $2,270 | Not Implemented |
UL0230 # 08 Y:1999 | 08 | 1999 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $2,893 | $2,120 | Implemented |
UL0230 # 07 Y:1999 | 07 | 1999 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $1,500 | $0 | Implemented |
UL0230 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,353 | $500 | Implemented |
UL0230 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,394 | $40 | Implemented |
UL0230 # 03 Y:1999 | 03 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,860 | $0 | Not Implemented |
MA0453 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,476 | $45,000 | Not Implemented |
MA0453 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $60,085 | $139,425 | Not Implemented |
MA0453 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $38,897 | $96,900 | Not Implemented |
MA0453 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,766 | $19,425 | Not Implemented |
MA0453 # 05 Y:1999 | 05 | 1999 | USE LESS WASTEFUL PACKAGING | $8,714 | $15,000 | Not Implemented |
MA0453 # 06 Y:1999 | 06 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,433 | $10,115 | Not Implemented |
IA0232 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $704 | $828 | Not Implemented |
IA0232 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,827 | $537 | Implemented |
IA0232 # 07 Y:1999 | 07 | 1999 | CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE | $9,540 | $16,088 | Not Implemented |
IA0232 # 05 Y:1999 | 05 | 1999 | CONVERT TO ELECTROSTATIC POWDER COATING | $150,000 | $28,000 | Not Implemented |
IA0232 # 06 Y:1999 | 06 | 1999 | RECYCLE CLEANING SOLVENT AND REUSE | $33,891 | $10,300 | Implemented |
IA0232 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,087 | $445 | Not Implemented |
IA0232 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,704 | $13,064 | Not Implemented |
IA0232 # 08 Y:1999 | 08 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $31,898 | $175,500 | Not Implemented |
UD0583 # 03 Y:1999 | 03 | 1999 | INSTALL SKYLIGHTS | $2,731 | $7,004 | Not Implemented |
UD0583 # 01 Y:1999 | 01 | 1999 | SCHEDULE DELIVERIES ACCORDING TO DEMAND | $6,264 | $0 | Implemented |