IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

156

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0868 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,204 $4,676 Implemented
GT0868 # 03 Y:2009 03 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,079 $12,000 Not Implemented
GT0868 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,368 $4,750 Implemented
GT0868 # 01 Y:2009 01 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,075 $19,000 Not Implemented
GT0868 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,232 $60,000 Implemented
GT0868 # 02 Y:2009 02 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,414 $3,000 Not Implemented
IA0445 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,949 $19,383 Not Implemented
IA0445 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,637 $506 Not Implemented
IA0445 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,180 $560 Not Implemented
IA0445 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $5,460 $100 Not Implemented
IA0445 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $1,603 $4,551 Not Implemented
IA0445 # 09 Y:2009 09 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $134 Not Implemented
IA0445 # 08 Y:2009 08 2009 REDUCE VENTILATION AIR $18,248 $20,000 Not Implemented
IA0445 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,414 $25 Not Implemented
IA0445 # 02 Y:2009 02 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $962 $81 Not Implemented
TT0036 # 03 Y:2009 03 2009 INSTALL SPECTRAL REFLECTORS / DELAMP $1,655 $3,220 Not Implemented
TT0036 # 02 Y:2009 02 2009 DISCONNECT BALLASTS $3,640 $0 Implemented
TT0036 # 04 Y:2009 04 2009 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $21,675 $30,000 Not Implemented
TT0036 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,980 $2,000 Implemented
TT0036 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,350 $6,490 Not Implemented
TT0036 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,660 $800 Implemented
UM0356 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $12,510 $3,000 Not Implemented
UM0356 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $36,798 $13,000 Not Implemented
UM0356 # 01 Y:2009 01 2009 RECOVER WASTE HEAT FROM EQUIPMENT $140,582 $6,000 Not Implemented
UM0356 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,424 $9,135 Not Implemented