IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

489

matching recommendations
Reset
SIC 3711 Motor Vehicles And Car Bodies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0305 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,860 $2,500 Implemented
OK0529 # 01 Y:1997 01 1997 SCHEDULE DELIVERIES ACCORDING TO DEMAND $37,800 $20,000 Not Implemented
OK0529 # 02 Y:1997 02 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,974 $7,000 Not Implemented
OK0529 # 03 Y:1997 03 1997 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $6,792 $22,365 Not Implemented
OK0529 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,030 $4,595 Implemented
OK0529 # 05 Y:1997 05 1997 REDUCE VENTILATION AIR $1,370 $5,600 Not Implemented
OK0529 # 06 Y:1997 06 1997 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $770 $0 Not Implemented
OK0529 # 07 Y:1997 07 1997 RECOVER WASTE HEAT FROM EQUIPMENT $499 $1,086 Implemented
OK0529 # 08 Y:1997 08 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $207 $1,440 Implemented
CO0353 # 01 Y:1996 01 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $92,720 $50,000 Implemented
CO0353 # 02 Y:1996 02 1996 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $24,450 $4,000 Implemented
CO0353 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,709 $16,548 Not Implemented
CO0353 # 04 Y:1996 04 1996 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,550 $56,160 Implemented
CO0353 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,020 $700 Implemented
CO0353 # 06 Y:1996 06 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,582 $3,680 Implemented
CO0353 # 07 Y:1996 07 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $990 $220 Implemented
CO0353 # 08 Y:1996 08 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $82 $53 Implemented
UL0130 # 01 Y:1995 01 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $922 $0 Not Implemented
UL0130 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,808 $4,595 Not Implemented
UL0130 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $11,418 $5,400 Not Implemented
UL0130 # 04 Y:1995 04 1995 OPTIMIZE PLANT POWER FACTOR $17,564 $10,120 Not Implemented
UL0130 # 05 Y:1995 05 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $4,704 $20,700 Not Implemented
CO0312 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,660 $3,200 Implemented
CO0312 # 02 Y:1994 02 1994 INSTALL TIMERS AND/OR THERMOSTATS $1,960 $1,050 Implemented
CO0312 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,410 $210 Not Implemented