IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

483

matching recommendations
Reset
SIC 3711 Motor Vehicles And Car Bodies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1046 # 10 Y:2022 10 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,940 $0 Not Implemented
UD1046 # 09 Y:2022 09 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $35,495 $1,200 Not Implemented
UD1046 # 08 Y:2022 08 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $27,755 $60,000 Not Implemented
UD1046 # 07 Y:2022 07 2022 RECOVER WASTE HEAT FROM EQUIPMENT $12,615 $1,500 Not Implemented
UD1046 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,166 $0 Implemented
UD1046 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,795 $3,279 Not Implemented
UD1046 # 04 Y:2022 04 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $43,076 $3,500 Implemented
UD1046 # 03 Y:2022 03 2022 IMPROVE COMBUSTION CONTROL CAPABILITY $261,813 $100 Not Implemented
UD1046 # 02 Y:2022 02 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,323 $0 Not Implemented
UD1046 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,214 $200,000 Implemented
TT0273 # 01 Y:2022 01 2022 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $197,305 $1,241,200 Not Implemented
TT0273 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $65,016 $5,000 Implemented
TT0273 # 03 Y:2022 03 2022 INSULATE BARE EQUIPMENT $51,693 $8,551 Not Implemented
TT0273 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,155 $2,860 Implemented
TT0273 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,192 $2,000 Not Implemented
TT0273 # 06 Y:2022 06 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,707 $400 Not Implemented
TT0273 # 07 Y:2022 07 2022 INSULATE BARE EQUIPMENT $1,084 $428 Not Implemented
TT0273 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,072 $1,926 Implemented
TT0273 # 09 Y:2022 09 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $780 $2,250 Not Implemented
TT0273 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $633 $1,500 Not Implemented
TT0273 # 11 Y:2022 11 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $356 $700 Implemented
UF0572 # 08 Y:2022 08 2022 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,635 $4,650 Implemented
UF0572 # 07 Y:2022 07 2022 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,245 $11,975 Implemented
UF0572 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,414 $756 Implemented
UF0572 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $4,007 $8,760 Implemented