IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 3713 Truck And Bus Bodies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0550 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,426 $4,394 Not Implemented
NC0550 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,953 $23,900 Not Implemented
NC0550 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $634 $100 Implemented
NC0550 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,820 $100 Not Implemented
NC0550 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,519 $2,100 Not Implemented
NC0550 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,444 $2,700 Not Implemented
NC0550 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,015 $984 Implemented
NC0550 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,742 $46,719 Implemented
NC0550 # 08 Y:2015 08 2015 USE PHOTOCELL CONTROLS $382 $150 Not Implemented
NC0550 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $316 $868 Not Implemented
NC0550 # 11 Y:2015 11 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,900 $18,900 Not Implemented
NC0550 # 12 Y:2015 12 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $381 $525 Not Implemented
NC0550 # 13 Y:2015 13 2015 DEVELOP A REPAIR/REPLACE POLICY $1,729 $4,256 Not Implemented
NC0517 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $5,090 $12,500 Not Implemented
NC0517 # 13 Y:2014 13 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $525 $160 Not Implemented
NC0517 # 12 Y:2014 12 2014 DEVELOP A REPAIR/REPLACE POLICY $1,458 $4,256 Not Implemented
NC0517 # 11 Y:2014 11 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $10,806 $5,000 Not Implemented
NC0517 # 10 Y:2014 10 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,346 $200 Implemented
NC0517 # 09 Y:2014 09 2014 INSTALL COMMON HEADER ON COMPRESSORS $9,004 $8,600 Not Implemented
NC0517 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,395 $100 Implemented
NC0517 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,941 $5,000 Not Implemented
NC0517 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $5,506 $15,200 Not Implemented
NC0517 # 04 Y:2014 04 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,998 $2,000 Not Implemented
NC0517 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,226 $215,258 Implemented
NC0517 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $74,398 $162,227 Implemented