Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 3713 | Truck And Bus Bodies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0620 # 10 Y:2022 | 10 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,028 | $9,280 | Not Implemented |
WV0620 # 09 Y:2022 | 09 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,129 | $1,773 | Not Implemented |
WV0620 # 08 Y:2022 | 08 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $2,669 | $3,970 | Not Implemented |
WV0620 # 07 Y:2022 | 07 | 2022 | OPTIMIZE PLANT POWER FACTOR | $2,785 | $7,090 | Implemented |
WV0620 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,394 | $7,905 | Implemented |
WV0620 # 05 Y:2022 | 05 | 2022 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $4,159 | $8,300 | Not Implemented |
WV0620 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,233 | $660 | Implemented |
WV0620 # 03 Y:2022 | 03 | 2022 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $7,597 | $37,000 | Not Implemented |
WV0620 # 02 Y:2022 | 02 | 2022 | USE EVAPORATION TO CONCENTRATE MATERIAL | $9,086 | $4,900 | Not Implemented |
WV0620 # 01 Y:2022 | 01 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $13,903 | $67,984 | Not Implemented |
WV0229 # 13 Y:2001 | 13 | 2001 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $45,000 | $15,000 | Implemented |
WV0229 # 14 Y:2001 | 14 | 2001 | ADVERTISE PRODUCT OR SERVICE | $13,200 | $2,000 | Implemented |
WV0229 # 01 Y:2001 | 01 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $948 | $300 | Implemented |
WV0229 # 12 Y:2001 | 12 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $13,680 | $220 | Implemented |
WV0229 # 11 Y:2001 | 11 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,192 | $100 | Implemented |
WV0229 # 10 Y:2001 | 10 | 2001 | INSTALL OCCUPANCY SENSORS | $2,118 | $450 | Not Implemented |
WV0229 # 09 Y:2001 | 09 | 2001 | INSTALL SPECTRAL REFLECTORS / DELAMP | $6,189 | $11,368 | Not Implemented |
WV0229 # 08 Y:2001 | 08 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,323 | $1,200 | Implemented |
WV0229 # 07 Y:2001 | 07 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $861 | $400 | Not Implemented |
WV0229 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $755 | $400 | Not Implemented |
WV0229 # 05 Y:2001 | 05 | 2001 | USE SYNTHETIC LUBRICANT | $1,215 | $450 | Implemented |
WV0229 # 04 Y:2001 | 04 | 2001 | INSTALL TIMERS AND/OR THERMOSTATS | $3,599 | $350 | Not Implemented |
WV0229 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,684 | $4,400 | Not Implemented |
WV0229 # 02 Y:2001 | 02 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $776 | $750 | Implemented |